Skip to main content

Turkey turnkey tunnel deal for Siemens

Turkey's General Directorate of Highways (KGM or Karayollari Genel Müdürlügü), is ordering power, lighting and ventilation equipment from Siemens for a major tunnel project. The Dorukhan Tunnel linking Mengen and Devrek will be equipped with the package from Siemens, which includes associated safety and communications systems. The size of the deal has not been released and the handover of the new system is scheduled for January 2012.
April 20, 2012 Read time: 2 mins
RSSTurkey's General Directorate of Highways (KGM or Karayollari Genel Müdürlügü), is ordering power, lighting and ventilation equipment from 189 Siemens for a major tunnel project. The Dorukhan Tunnel linking Mengen and Devrek will be equipped with the package from Siemens, which includes associated safety and communications systems. The size of the deal has not been released and the handover of the new system is scheduled for January 2012. meanwhile project to equip Turkey’s DAK (Düzce-Akcakoca-Eregli) tunnel system in the province of Zonguldak, placed with Siemens by KGM at the end of 2010, is already close to completion. The Turkish Transportation Ministry is investing heavily at present in a bid to develop the country's highway network. In September 2009, together with Turkey's General Directorate of Highways, KGM, the ministry presented plans for 12 new highway routes, which are due to be completed by 2023. In the provinces of Kastamonu, Zonguldak and Düzce on the Black Sea, extensive construction projects are either already underway or due to commence. One such construction project is the 1,050m long Dorukhan Tunnel on the Kastamonu Highway. Siemens is responsible for power supply and distribution for the tunnel and will supply the entire communications and automation equipment. The safety systems will include camera and video surveillance based on CCTV. The Automatic Incident Detection System not only helps to identify traffic jams and accidents but can also detect any build-up of smoke. With the help of sensors, modern lighting and ventilation systems monitor visibility and air quality. All of the ventilation, lighting, traffic control and safety systems are connected to the Supervisory Control and Data Acquisition (SCADA) control system, which also monitors them. An important factor in Siemens receiving the order was the positive experience the Turkish General Directorate of Highways has had with Siemens in previous tunnel construction projects in Turkey, such as the Nefise Akçelik Tunnel commissioned in 2007.

Related Content

  • Global ANPR market 2010-2014
    May 21, 2012
    Research and Markets has announced the addition of the "Global Automatic Number Plate Recognition Market 2010-2014" report to its offering. TechNavio's analysts forecast that the global ANPR market is expected to grow at a CAGR of 30 per cent and will reach US$579.8 million in 2014.
  • Siemens to upgrade Santa Clara light rail
    March 17, 2017
    Siemens has been chosen by the Santa Clara Valley Transportation Authority (VTA), a US independent special district that provides sustainable, accessible, community-focused transportation options for Santa Clara County, California, to provide innovative electrification technology to power the Guadalupe Corridor light rail line. VTA’s infrastructure modernisation will replace 27-year-old systems with Siemens’ new technology that includes advanced monitoring and diagnostic features to streamline maintenance a
  • Traficon AID deployed on Busan-Geoje fixed link project
    March 2, 2012
    Traficon, an exhibitor at this week’s 17th ITS World Congress in Busan, South Korea, has revealed that the company’s involvement with the city will continue long after the event closes.
  • Indra to implement Kuwait’s traffic monitoring system
    April 7, 2015
    In a contract valued at around US$18 million, Indra is to implement a traffic monitoring system in Kuwait City on behalf of the Kuwait Municipality. The contract includes the technology for the traffic management centre, installation of over 200 permanent traffic sensors and gathering and integration of data from about 3,000 locations throughout the city within the new monitoring system, including integration of different vehicle detection technologies, with radar systems, loops, video cameras and weighing