Skip to main content

Hindhead Tunnel safety demonstration

A full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity.
April 20, 2012 Read time: 2 mins
RSSA full scale major incident emergency exercise has been carried out in the UK’s brand new Hindhead Tunnel on the A3 in Surrey. Located just to the south of London, the A3 route carries heavy traffic volumes and the existing road link has been a major bottleneck for capacity as well as proving a safety risk for the area. The new tunnel, due to open soon will relieve traffic jams in the area and boost capacity. However the link has also been designed with the latest safety technology and to meet the tough new European regulations on tunnel safety, introduced in the wake of two disastrous tunnel fires that caused multiple fatalities in Switzerland and Austria. At the 1.9km Hindhead Tunnel emergency crews from ambulance, fire and police services tested response times for a major incident. The staged scenario involved 16 mock casualties from two separate vehicle crashes and a serious fire underground. The emergency exercise involved 280 people and following the staged incident, car drivers, played by actors, began to walk outside to safety. Statistics suggest that a major incident can be expected in the A3 tunnel on average once every seven years, and a minor incident will lead to a tunnel closure every three years. The tunnel is due to open to traffic shortly. The link will carry some 30,000 vehicles/day and keep traffic away from the Devil's Punchbowl, a heathland site which is a special protection area for wild birds conservation.

Related Content

  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • Iteris releases Abacus 2.0
    April 20, 2012
    Iteris has introduced Abacus 2.0, its next generation traffic incident detection and data collection product that provides traffic engineers and departments of transportation a software-based ‘force multiplier’ that leverages existing camera systems to collect real-time traffic data, rapidly identify incidents, and gain enhanced traffic flow information in a ready-to-use graphical user interface (GUI) format.
  • Dynamic toll payments on Virginia’s 495 express lanes
    October 19, 2012
    Private sector operator, Transurban, operators of Virginia’s I-495 express lane, has unveiled the highway’s incident management centre where the flow of vehicles will be monitored on a widescreen monitor displaying a dozen camera angles. The new lanes are expected to open by the end of fall. The centre will monitor traffic volume 24/7 in order to compute toll rates. The new roadway, connecting the Dulles toll road to the I-395/I-95/Springfield interchange fourteen miles to the south, will charge drivers dyn
  • Citilog’s early detection prevents tragedy in Alpine tunnel
    July 23, 2025

    Citilog will be showcasing the real-world power of its automatic incident detection (AID) technology by highlighting how it operated in a real-world situation when the system helped prevent a potential tragedy in France’s Vuache Tunnel.

    At 10:33 on 11 June 2024, Citilog's AI-powered system identified a stopped vehicle and immediately triggered tunnel closure procedures. By 10:38, when a fire broke out on the truck, the tunnel was already sealed, preventing other vehicles from entering what could have been a catastrophic situation.