Skip to main content

Heart of Slough implements Siemens wireless traffic detection

As part of the Heart of Slough improvement project, new traffic intersections across seven key sites in and around Slough, UK have been equipped with a total of 162 Siemens WiMag wireless magnetometer sensors by Siemens to help improve the management of traffic using the A4 and travelling to and from the town centre. Complementing the company’s proven loop and radar detection solutions, the sensors provide the Heart of Slough project with an alternative traffic detection system that uses magnetic disturbanc
February 21, 2013 Read time: 2 mins
As part of the Heart of Slough improvement project, new traffic intersections across seven key sites in and around Slough, UK have been equipped with a total of 162 189 Siemens WiMag wireless magnetometer sensors by Siemens to help improve the management of traffic using the A4 and travelling to and from the town centre.

Complementing the company’s proven loop and radar detection solutions, the sensors provide the Heart of Slough project with an alternative traffic detection system that uses magnetic disturbances to detect vehicles and low power wireless technology to transmit data to host controllers.

The system detects traffic at seven new intersections on the A4, Wellington Street, through the centre of town, with access to and from the High Street and Slough’s iconic new bus station.

According to engineer Chris Green representing 6651 Slough Borough Council’s Network Management, the new wireless traffic detection system from Siemens has enabled the council to implement the most cost effective solution for the new sites on the network.

Completed within twelve months, the major road network improvements in the Heart of Slough project included removing the Brunel roundabout and creating a new four-way junction controlled by traffic signals to improve traffic flow and installing new improved road level pedestrian crossings. Led by Slough Borough Council and part funded by the Homes and Communities Agency (HCA), the project also included upgrades to the existing road and public transport infrastructure to ease journeys, improve safety and create an attractive gateway to the Heart of Slough. Traffic congestion in the town centre has reduced to below modelled levels for the scheme and bus priority has been included without delaying other road users.

For more information on companies in this article

Related Content

  • Why integrated traffic management needs a cohesive approach
    April 10, 2012
    Traffic control is increasingly being viewed as one essential element of a wider ‘system of systems’ – the smart city. Jason Barnes, Jon Masters and David Crawford report on latest ideas and efforts for making cities ‘smarter’ Virtually every element of the fabric and utilitarian operations that make urban areas tick can now be found somewhere in the mix that is the ‘smart city’ agenda. Ideas have expanded and projects pursued in different directions as the rhetoric on making cities ‘smarter’ has grown. App
  • Flexibility, interoperability is key to future traffic management
    February 3, 2012
    Jon Taylor of Faber Maunsell and Tabatha Bailey of Transport for London describe how an unusual mix of traffic practitioners, researchers and industry are working together to build new tools for the future. As we face higher expectations for managing congestion from both citizens and politicians, and as more and more data is becoming available from new sources, our traffic management challenge is changing.
  • Rwanda's mobility plan in seven junctions
    June 16, 2025
    ITS improvements at just seven intersections could be the key to improving transportation in Rwanda’s capital, Kigali: Shem Oirere reports from East Africa
  • Swarco signs aid peak time traffic flow on residential streets
    January 26, 2016
    The London Borough of Camden has installed two Swarco Prism signs at either end of a width-restricted road in a bid to curb drivers using the road to avoid congestion during peak periods. The signs are timed to change at peak periods of day to create a short one-way section and ease traffic flow. Outside these hours, priority working signs manage the narrow stretch of road. The signs include integrated PC controls, which enable operators to remotely control and alter the timing of the switchover as req