Skip to main content

Toll upgrades for Sydney Harbour Bridge and Tunnel

Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to replace the existing road tolling systems for Sydney Harbour Bridge and Sydney Harbour Tunnel operated by the New South Wales Roads and Maritime Services (RMS). The contract, worth more than US$112 million (€10 million), comprises supply of a new tolling system, as well as maintenance and support for five years. The new tolling solution is expected to be operating by early 2017. Kapsch will deliver its latest tolling technology based on th
March 29, 2016 Read time: 2 mins
4984 Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to replace the existing road tolling systems for Sydney Harbour Bridge and Sydney Harbour Tunnel operated by the New South Wales Roads and Maritime Services (RMS).

The contract, worth more than US$112 million (€10 million), comprises supply of a new tolling system, as well as maintenance and support for five years. The new tolling solution is expected to be operating by early 2017.

Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow (MLFF) platform and next vehicle detection and classification (N-VDC) solution.

The Sydney Harbour Bridge currently uses an existing automated solution installed in the pre-existing manual toll plazas built when tolls were paid in cash. The new solution will allow the toll plazas to be removed and the traffic flow on the bridge to be improved.

The Sydney Harbour Tunnel has a slightly newer setup without plazas, but will be upgraded as part of the contract to the latest tolling technology.

For more information on companies in this article

Related Content

  • Kapsch TraffiCom Australia awarded tolling system contract
    September 3, 2012
    Kapsch TraffiCom Australia is to install a new open road tolling system on Sydney’s M5 south west motorway. The contract, worth over US$10.5 million has been awarded by Australia’s Interlink Roads, who, in partnership with the New South Wales Government, have developed a programme of enhancements to the motorway to provide three lanes in each direction between Camden Valley Way and King Georges Road.
  • Taiwan to go all-electronic free flow tolling
    November 28, 2013
    Taiwan’s 900 kilometres of toll roads will transition to all-electronic free flow operations early next year. The roads, which include three north-south routes with 22 toll points, carry out around 1.7 million transactions a day, generating some US$700 million of annual toll revenue. Private contractor Far Eastern Electronic Toll Collection Company (FETC), under contract to the National Freeway Bureau to collect the tolls, says that the IR-based toll system worked well and some 43 per cent of transactio
  • Australian tag order for Q-Free
    January 8, 2014
    Australia’s Roads and Maritime Services (RMS) has awarded Q-Free an order for its OBU610 tags valued at US$2.4 million. This latest generation toll transponder is claimed by the company to be the smallest of its kind, yet powerful enough to support both single and multiple protocol applications. With a battery life of more than seven years, the transponder supports any application from single lane to full multi-lane free-flow and open-road tolling.
  • Kapsch TrafficCom wins big in Sydney
    December 9, 2014
    The WestConnex Delivery Authority (WDA) in Sydney, Australia, has awarded Kapsch CarrierCom subsidiary, Kapsch CarrierCom Australia, the contract to supply a roadside tolling system to support capacity enhancement to the M4 motorway widening project as part of Stage 1 of the WestConnex motorway scheme in Sydney. The award covers two contracts for the initial phase of the project, one for the roadside equipment for the M4 widening segment and one for maintenance and support. The project is designed to in