Skip to main content

Atlanta’s reversible express lanes project opens

The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic. Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental
January 27, 2017 Read time: 2 mins
The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic.
 
4089 Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental document. The 754 Georgia Department of Transportation’s (GDOT’s) NaviGAtor software, a rebranded version of Parsons’ Intelligent NETworks advanced transportation management system, will monitor the express lanes. In addition, Parsons’ Intelligent NETworks has been installed at the State Roadway and Tolling Authority (SRTA) to display current toll rates on changeable message signs.

Intelligent NETworks will be used to display comparative speeds on dynamic message signs, showing the current average speed along the corridor for the express lanes and general purpose lanes. The software will also monitor the express lanes via traffic sensors and video cameras to help coordinate response to any incidents. Enhanced features will immediately notify roadway operators if a vehicle is detected travelling the wrong way. In addition, Parsons’ software allows for centre-to-centre connection between SRTA software and NaviGAtor to help automate coordination between the two agencies while operating the express lanes.

For more information on companies in this article

Related Content

  • Intersection collision avoidance system trial
    January 31, 2012
    Although much of the emphasis of research into intersection management has tended to concentrate on the needs of urban locations, there remain specific issues pertaining to rural intersections which need to be addressed. Here, Rebecca Szymkowski and Greg Helgeson, Wisconsin DOT, Todd Szymkowski, University of Wisconsin-Madison, and Craig Shankwitz and Arvind Menon, University of Minnesota detail progress on an intersection collision avoidance system for more remote locations.
  • New Zealand’s smart motorway opens
    July 15, 2016
    Commuters heading north on Wellington’s urban motorway will now get a smoother trip as the new lane is fully opened and New Zealand’s first smart motorway is turned on in the northbound direction. Using variable speed limits, which will be adjusted in real time in response to changing traffic conditions, the smart motorway will pace vehicles to smooth the traffic flow. Officials say this will result in safer journeys with more predictable travel times. It will also free up nearby roads for better public
  • Virginia Automated Corridors unveiled
    June 3, 2015
    The Virginia Automated Corridors, a new initiative that its developers claim will revolutionise the development and deployment of automated vehicles, has been unveiled on more than 70 miles of interstates and arterial roads in the Northern Virginia region. The Corridors were established by the Virginia Tech Transportation Institute in partnership with the Virginia Department of Transportation; the Virginia Department of Motor Vehicles; Transurban; and Here, Nokia’s mapping business in support of the tran
  • US DOT announces funding for Ohio BRT project
    June 3, 2016
    The US Department of Transportation’s Federal Transit Administration (FTA) has awarded US$37.5 million in federal grant funds to the Central Ohio Transit Authority (COTA) for a new Bus Rapid Transit (BRT) service in Columbus. The new line, CMAX, will help relieve passenger crowding and spur economic development along Cleveland Avenue, one of the city’s busiest travel corridors The 15.6-mile BRT service will provide a much-needed option in a corridor with high transit use. CMAX will help reduce passenger