Skip to main content

Atlanta’s reversible express lanes project opens

The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic. Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental
January 27, 2017 Read time: 2 mins
The I-75 South Metro reversible express lane project In Atlanta, Georgia, US, will open this weekend along almost 21km between Highway 138 and Highway 155 on the new double-lane addition to the I-75 median. The lanes will carry traffic northbound toward downtown Atlanta during the morning rush hour and southbound during midday and peak afternoon and evening traffic.
 
4089 Parsons prepared conceptual design reports for the project, including lane configuration and access studies, as well as the environmental document. The 754 Georgia Department of Transportation’s (GDOT’s) NaviGAtor software, a rebranded version of Parsons’ Intelligent NETworks advanced transportation management system, will monitor the express lanes. In addition, Parsons’ Intelligent NETworks has been installed at the State Roadway and Tolling Authority (SRTA) to display current toll rates on changeable message signs.

Intelligent NETworks will be used to display comparative speeds on dynamic message signs, showing the current average speed along the corridor for the express lanes and general purpose lanes. The software will also monitor the express lanes via traffic sensors and video cameras to help coordinate response to any incidents. Enhanced features will immediately notify roadway operators if a vehicle is detected travelling the wrong way. In addition, Parsons’ software allows for centre-to-centre connection between SRTA software and NaviGAtor to help automate coordination between the two agencies while operating the express lanes.

For more information on companies in this article

Related Content

  • Getting more for less from traffic data
    August 15, 2012
    Collection of traffic and transit data has grown significantly, combining with advances in connectivity and computational modelling to good effect. Desire to do more with less – to make budgets go further – has helped create a boom in the collection and study of traffic and transport data. Studies are becoming longer, greater in number and further in-depth as more intelligence is sought, plus, transportation agencies are looking to make processes of data collection less costly, or more efficient.
  • Open Roads updates Alaska’s 511 website and wins Virginia contract
    April 22, 2013
    Open Roads and the Alaska Department of Transportation and Public Facilities (DOT&PF) have introduced a new version of the 511 Traveler Information Website
  • Glasgow’s new Operations Centre has a key role in city’s future
    June 6, 2014
    David Crawford investigates a control centre with a future. Destined to play a central role in keeping the city and its transport running smoothly during the 2014 Commonwealth Games in July, the new Glasgow Operations Centre in Scotland’s largest urban centre formally went live earlier this year. The aim was to dry run its far-reaching integration of previously distinct core systems and familiarise the public with the initial phase of what will be a long-term post-event legacy. The centre brings together, i
  • New Jersey DOT unveils travel time information signs
    January 21, 2013
    Capitalising on its investment in Intelligent Transportation Systems (ITS) technology, New Jersey Department of Transportation (NJDOT) is to install permanent dynamic message signs (DMS) along New Jersey’s interstate highways. The signs display major waypoints, such as intersecting highways or significant roadway features, and indicate how many minutes it will take to reach that waypoint. The DOT has completed the testing phase on fifteen DMS on I-287 and I-195 and is planning further signs on other major