Skip to main content

Traficon technology for Stockholm road tunnels

Video detection specialist Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules designed for automatic incident detection and traffic data analysis. 22 VIP-T video image processing modules have already been installed in the Södra Länken tunnel. In cooperation with traffic specialists Swarco Sweden and ISG Systems AB Sweden, Traficon will insta
June 25, 2012 Read time: 2 mins
Video detection specialist 5574 Traficon has been awarded a contract to provide video image processors for traffic monitoring inside the Södra Länken and Norra Länken tunnels in Stockholm, Sweden. The company will provide some 763 of its VIP-T modules designed for automatic incident detection and traffic data analysis.

22 VIP-T video image processing modules have already been installed in the Södra Länken tunnel. In cooperation with traffic specialists 129 Swarco Sweden and 5572 ISG Systems AB Sweden, Traficon will install another 370 modules during 2012. Installation of 393 VIP-T modules for the Norra Länken tunnel is expected to start after 2012 in cooperation with ISG Systems Sweden for delivery to Tunnelentreprenad, a consortium owned by Swarco Nordic and Rolf Tannergård.

Both Södra Länken and Norra Länken are new traffic routes that have been designed to help alleviate increasing traffic volumes in and around Stockholm. The 6km long Södra Länken, of which 4.7km is in tunnels, is the southern part of the Stockholm ring road and is the largest ever road tunnel construction in Sweden. Construction of the 5km long northern Norra Länken, largely in tunnels, started in 2006 and is expected to be completed by 2015.

For more information on companies in this article

Related Content

  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Dublin Tunnel gets average speed enforcement
    June 13, 2016
    Transport Infrastructure Ireland (TII) is working with the4 Irish police force, An Garda Síochána, on the installation of Ireland’s first average speed camera enforcement system, which will be deployed in the Dublin Port Tunnel. Opened in 2006, the 4.5 km tunnel forms part of the M50 C-Ring road around Dublin City. Traffic levels through the tunnel have increased by 40 per cent over the last five years and as a result there is statistically, an increase in the potential for collisions and accidents.