Skip to main content

Temporary CCTV poses more challenges than permanent installations

Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
June 12, 2015 Read time: 4 mins
Frank Gearon installing feeds to the ‘Wonderbox’ for another temporary CCTV system.

Long-term roadworks pose particular problems for temporary surveillance installations.

Converting the hard shoulder to a running lane, either full- or part-time, is the 1841 UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.

Designing and implementing a number of these temporary CCTV monitoring systems for such projects is 7692 P&D Specialist Services. Current projects include 78 cameras along a 33km section of the M1 (Junctions 15-19), 109 cameras along 31km of the M3 (Junctions 2-4a) and 142 cameras on a 35km stretch of the M60 and M62 motorways around Manchester.

In April 2015 work started on a new section of ‘managed motorway’ along 23km of the M1 (Junctions 32-35a) where the hard shoulder is being converted into a running lane. As often happens with motorway projects during the construction phase the hard shoulder is inaccessible to motorists, meaning there are no emergency telephones and motorists have nowhere to stop safely and summon assistance in event of a breakdown or accident. “Before any construction work can start, temporary cameras have to be set up at regular intervals along the length of the work zone to monitor the area and detect breakdowns, accidents or incidents. That’s where the CCTV solutions we deliver come in,” says Frank Gearon, project manager of highway industry specialist P&DSS, “The aim is to deliver a real-time overview of the entire stretch of works and link all the images from the cameras back to the 24/7 manned control room.”

The company is a NICEIC contractor certified under the Highways Agency’s Sector Scheme Approval to carry out electrical works on the motorway network. At the start of this latest M1 project, it will initially deploy 30 CCTV cameras and that number will eventually double as the project progresses. Images from the cameras are streamed to a temporary monitoring station where they are also recorded, and because construction work cannot start until the cameras are working, Gearon says speed of deployment and system reliability are paramount.

“We use fibre optic cables to cope with the long distances involved, and AMG’s transmission equipment as it requires a smaller number of fibres which speeds splicing during installation. On some of the earlier projects we used AMG’s 3700 series and since 2013 we’ve used the AMG 9024– multi-service Ethernet switch (M-SES) series known as the ‘Wonderbox’.”

The ‘Wonderbox’ was designed to bridge legacy CCTV systems with new IP cameras and provides Layer 2 managed Ethernet functionality without having to involve third party products. By integrating low-speed serial data channels and alarm contacts, alongside analogue video, onto an Ethernet backbone it ‘bridges the gap’ between analogue and ‘IP’ technologies.

Due to the need to keep the roads open for traffic, such projects often run for 18 – 24 months so the CCTV systems have to withstand prolonged exposure to ambient weather conditions, vibration and dust so systems need to be very robust. 

However, that is not always enough as Gearon explains: “In major engineering projects like these, damage to cables and roadside equipment occurs frequently and there is a real risk of system failure, so on the M60/M62 project there was a requirement for a proprietary redundancy feature.

AMG was able to meet this need using the ‘X-ring’ to allow an unlimited number of M-SES units on each fibre loop, so sub-loops can be seamlessly added to provide redundancy protection in the case of a switch or fibre being damaged. And by integrating the dedicated video codec and RS232/RS485 into the MSES switch, video lag and control data is minimal.”

As the CCTV surveillance systems on the existing projects have operated over the winter period without a problem, the P&DSS/AMG solution appears to be lasting the distance.

For more information on companies in this article

Related Content

  • Cohu introduces its latest HDTV 1080P video cameras
    December 4, 2012
    US-based Cohu expands its family of HDTV camera products, with the 7500HD series, offering excellent image quality, event management processing and network stability. Available in three configurations, the company says all three are robustly designed and ideal for security, surveillance and remote monitoring applications. The 710HD is a fixed network box camera, indoor IP50 rated; the 7520HD is a fixed network dome camera, indoor and outdoor IP66 rated; while the 7530HD is a fixed network camera, outdoo
  • Newham installs Videalert platform for bus lane and traffic contraventions
    March 9, 2018
    The London Borough of Newham has installed Videalert’s CCTV-based system to provide unattended enforcement of bus lanes and moving traffic contraventions with a focus on box junctions. The open network video interface forum Profile S certified digital high definition cameras and processing units are based at 22 locations that have high levels of driver non-compliance. Newham has also invested in additional data storage capacity to accommodate future system expansion at other sites that need enforcement
  • More for less with traffic control centre technology
    May 31, 2013
    Rich pickings are now available in a maturing market supplying screens and processors for traffic management operations. Jon Masters reviews what’s on offer. Competition in supply of technology for traffic management and control centres has increased significantly in recent years. Suppliers introduced better products and customers are changing the way they operate, which benefits traffic authorities and emergency services alike. These are the views of Electrosonic’s control rooms solutions sales manager Pa
  • Omnitron releases high-power PoE switches
    October 15, 2018
    Omnitron Systems says its high-power Power over Ethernet (HPoE) switches enable fibre optic distance extension to HPoE powered devices. Sankar Ramachandran, Omnitron’s product marketing director, says the PoE RuggedNet and OmniConverter fibre switches allow users to deploy Pan-Tilt-Zoom cameras with heaters and blowers, small cells, and multi-stream wireless access points at any distance from the head end network equipment. According to Ominitron, the RuggedNet is designed for transportation and Internet