Skip to main content

Temporary CCTV poses more challenges than permanent installations

Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
June 12, 2015 Read time: 4 mins
Frank Gearon installing feeds to the ‘Wonderbox’ for another temporary CCTV system.

Long-term roadworks pose particular problems for temporary surveillance installations.

Converting the hard shoulder to a running lane, either full- or part-time, is the 1841 UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.

Designing and implementing a number of these temporary CCTV monitoring systems for such projects is 7692 P&D Specialist Services. Current projects include 78 cameras along a 33km section of the M1 (Junctions 15-19), 109 cameras along 31km of the M3 (Junctions 2-4a) and 142 cameras on a 35km stretch of the M60 and M62 motorways around Manchester.

In April 2015 work started on a new section of ‘managed motorway’ along 23km of the M1 (Junctions 32-35a) where the hard shoulder is being converted into a running lane. As often happens with motorway projects during the construction phase the hard shoulder is inaccessible to motorists, meaning there are no emergency telephones and motorists have nowhere to stop safely and summon assistance in event of a breakdown or accident. “Before any construction work can start, temporary cameras have to be set up at regular intervals along the length of the work zone to monitor the area and detect breakdowns, accidents or incidents. That’s where the CCTV solutions we deliver come in,” says Frank Gearon, project manager of highway industry specialist P&DSS, “The aim is to deliver a real-time overview of the entire stretch of works and link all the images from the cameras back to the 24/7 manned control room.”

The company is a NICEIC contractor certified under the Highways Agency’s Sector Scheme Approval to carry out electrical works on the motorway network. At the start of this latest M1 project, it will initially deploy 30 CCTV cameras and that number will eventually double as the project progresses. Images from the cameras are streamed to a temporary monitoring station where they are also recorded, and because construction work cannot start until the cameras are working, Gearon says speed of deployment and system reliability are paramount.

“We use fibre optic cables to cope with the long distances involved, and AMG’s transmission equipment as it requires a smaller number of fibres which speeds splicing during installation. On some of the earlier projects we used AMG’s 3700 series and since 2013 we’ve used the AMG 9024– multi-service Ethernet switch (M-SES) series known as the ‘Wonderbox’.”

The ‘Wonderbox’ was designed to bridge legacy CCTV systems with new IP cameras and provides Layer 2 managed Ethernet functionality without having to involve third party products. By integrating low-speed serial data channels and alarm contacts, alongside analogue video, onto an Ethernet backbone it ‘bridges the gap’ between analogue and ‘IP’ technologies.

Due to the need to keep the roads open for traffic, such projects often run for 18 – 24 months so the CCTV systems have to withstand prolonged exposure to ambient weather conditions, vibration and dust so systems need to be very robust. 

However, that is not always enough as Gearon explains: “In major engineering projects like these, damage to cables and roadside equipment occurs frequently and there is a real risk of system failure, so on the M60/M62 project there was a requirement for a proprietary redundancy feature.

AMG was able to meet this need using the ‘X-ring’ to allow an unlimited number of M-SES units on each fibre loop, so sub-loops can be seamlessly added to provide redundancy protection in the case of a switch or fibre being damaged. And by integrating the dedicated video codec and RS232/RS485 into the MSES switch, video lag and control data is minimal.”

As the CCTV surveillance systems on the existing projects have operated over the winter period without a problem, the P&DSS/AMG solution appears to be lasting the distance.

For more information on companies in this article

Related Content

  • The control room revolution - LCD screens and IP technology
    July 17, 2012
    Coming soon to a screen near you: Brady O. Bruce and John Stark of Jupiter Systems discuss trends in control room technologies. Perhaps the single most important trend in the control room environment over the last 12-18 months has been the accelerated move towards the adoption of flat-screen Liquid Crystal Display (LCD) technology. Having made their presence felt in the home environment, where they continue to replace outdated cathode ray tube-based technology, LCDs have reached the point where their perfor
  • AMG system deployed for India’s inaugural Formula One grand prix
    April 17, 2012
    AMG Systems has revealed that it supplied its AMG 5000 transmission solution for the new Indian Formula One circuit which hosted the inaugural Indian Formula One grand prix on 30 October, 2011. Indian based Pan Intellecom is responsible for implementing the surveillance project for the F1 event and managing director Harbir Singh explains why the company chose the AMG transmission solution. “We selected the AMG 5000 Series for the project and although we were very pressed for time leading up to the inaugural
  • Solar road studs aid night time road safety on the M20
    October 23, 2012
    UK company, Astucia, part of the Clearview Traffic Group, and Balfour Beatty Mott MacDonald has installed over 4,000 Astucia SolarLite road studs on the M20 junctions 8 to 9 between Ashford and Maidstone, on behalf of the UK Highways Agency. This section of the motorway lacks street lighting increasing the potential risk for night time accidents. The project involved upgrading the existing road markings and road studs to address the high number of collisions recorded in the dark and wet conditions. The exis
  • Multi-million dollar system to ease Columbus’ congestion
    April 3, 2013
    Columbus, Ohio is to benefit from a US$38.1 million traffic management system to replace the one installed in the 1970s to allow the city to respond more quickly to problem areas and speed up travel throughout Columbus and even in its suburbs. The new system will wrap all signals into a single network. More data will funnel to new software in the traffic-management center, where operators can decide how to handle traffic congestion. Nearly 500 miles of fibre-optic cable will run to most traffic signals, and