Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • August 1, 2014
    US Senate approves Highway Trust Fund patch
    The US Congress gave final approval last night to a US$10.8 billion bill to replenish the federal Highway Trust Fund and through to May 2015. It now goes to President Barack Obama for his signature. The Transportation Department had set Friday as the day the Highway Trust Fund would run out of reserves and told states they could expect an average 28 percent reduction in federal aid. The fund relies primarily on gasoline and diesel fuel taxes that haven’t been increase in two decades. Commenting on the
  • November 26, 2014
    Big data analytics identifies congestion increases
    Iteris has completed and published the Alameda County Transportation Commission (Alameda CTC) 2014 Level of Service Monitoring Report. The report was generated for speed-based congestion monitoring, utilising big data analytics in place of conventional in-field manual data collection for 205 miles of the 327 mile network. Use of big data analytics will be expanded in future monitoring cycles. Many agencies conduct congestion monitoring through manual data collection efforts. Agencies traditionally us
  • March 15, 2012
    Traffic signal priority initiatives aid better bus travel
    David Crawford investigates traffic signal priority initiatives developing for better bus travel on the US Pacific Coast Transit patronage rises by an average of 35% along commuter corridors equipped with bus rapid transit (BRT) systems, according to the US Department of Transportation’s Federal Transit Administration (FTA). BRT as defined as bus transit enhanced with ITS systems for better services, is winning new passengers attracted by opportunity to avoid increasing fuel costs and traffic congestion.
  • February 1, 2023
    New transit centre for Rhode Island
    Development will have space for bikes and is expected to serve three million users a year