Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • August 15, 2019
    IBTTA: tolling embraces future of mobility
    The future of mobility is a complex and changing topic. The IBTTA’s Bill Cramer finds the tolling industry is asking new questions – and finding some surprising new answers
  • April 22, 2013
    Dallas ICM will smarten up US-75
    Nine stakeholder agencies, multiple modes of travel (including bus and rail), reliable and accurate travel time information, parking information, and active traffic diversion for incidents; these capabilities and more are now available through the Dallas Integrated Corridor Management (ICM) program along US-75 that will be going “Live” April 2013. The I-15 and I-75 corridors in San Diego, CA recently went Live with their ICM system in March 2013.
  • March 24, 2014
    Athens just the ticket for LG CNS
    A Korea-Greece consortium led by LG CNS has been awarded a US$191.9 million project to build an e-ticket system for mass transit in Athens, the Seoul-based IT solution company, LG CNS, says. Under the project, overseen by the Athens Urban Public Transport Organisation (OASA), LG and its partner, Terna Energy of Greece, will install and operate the automatic fare collection system for the bus, trolley and subway system. The smart ticket project will replace conventional paper tickets, the company said.
  • July 29, 2013
    Engineering firm unveils I-70 improvement project
    International engineering firm Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado. Parsons had submitted an unsolicited proposal to Colorado Department of Transportation in 2011. The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021. The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The proje