Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

For more information on companies in this article

Related Content

  • Keeping cool in LA
    November 11, 2022
    As the earth’s temperatures rise, cities are set to become hotter. A project in Los Angeles may point the way to keeping cool while improving access to transit services in an uncertain future
  • Here map features 400 indoor parking garages
    February 2, 2022

    Here Technologies has added more than 400 indoor parking garages to its indoor map as part of a collaboration in North America with Apcoa and Propark Mobility.

    The indoor maps include key aspects of parking garages – individual parking spaces, lanes, ramps and pedestrian walkways.

  • Wavetronix finalizes deal for new headquarters, Utah
    November 20, 2017
    Wavetronix has announced it has purchased 68 acres in Springville, Utah to be the future site of its headquarters, following a year of negotiations with various property owners to evaluate the suitability of the property. It is located south of Hobble Creek on the east side of I-15 and construction will begin Spring 2018.
  • Wavetronix finalizes deal for new headquarters, Utah
    November 20, 2017
    Wavetronix has announced it has purchased 68 acres in Springville, Utah to be the future site of its headquarters, following a year of negotiations with various property owners to evaluate the suitability of the property. It is located south of Hobble Creek on the east side of I-15 and construction will begin Spring 2018.