Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • August 13, 2015
    Arizona DOT testing wrong-way vehicle detectors
    The Arizona Department of Transportation (ADOT) is testing wrong-way vehicle detection devices next to off-ramps along Phoenix-area freeways as part of an ongoing research effort to reduce the risk of wrong-way crashes. Three detectors, manufactured by Tapco have been installed along the northbound Interstate 17 exit to State Route 74, the eastbound Interstate 10 exit at Ray Road and the northbound Loop 101 off-ramp at Thunderbird Road. Two other detection devices, manufactured by Wavetronix, were instal
  • May 10, 2017
    Atlanta deploys Bluetooth-based DMS to help improve travel times
    The Cobb County Department of Transportation (CCDOT) in Georgia, USA, has activated six full-colour dynamic message signs (DMS) in the metropolitan Atlanta area in a bid to improve travel times and enable motorists to choose less-congested routes. The LED signs have been installed on Cobb Parkway, South Marietta Parkway, Roswell Road and Spring Road to provide travel time information for common destinations and indicate the congestion level related to specific routes in real time. Travel times on I-75 and C
  • November 27, 2015
    Swarco advanced parking guidance system now open at Houston Hobby Airport
    Swarco Traffic Americas’ advanced parking guidance system (PGS) partially opened at William P. Hobby Airport in Houston, Texas in time for the 2015 holiday season. Construction of the new multilevel garage, which began in 2014, was accelerated at the request of Houston Airport Systems to open 600 parking spaces in the new garage before the 2015 Thanksgiving holiday. Swarco collaborated with SpawGlass Contractors, the general contractor, to achieve this aggressive schedule. The PGS employs single spa
  • March 16, 2015
    Report analyses multiple ITS projects to highlight cost and benefits
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re