Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

For more information on companies in this article

Related Content

  • Campaign calls for full funding for metropolitan transport
    February 9, 2015
    A US pressure group is pushing for full funding for metropolitan transport, with a campaign that could have implications for other public transport systems. The Move NY team campaign aims to bring a faster, safer, fairer transportation system to the greater New York metropolitan region. The Metropolitan Transportation Authority (MTA) is responsible for public transportation in the US state of New York, serving 12 counties in south-eastern New York, along with two counties in south-western Connecticut und
  • London steps up enforcement of ‘bike boxes’
    August 15, 2013
    Transport for London (TfL), the Metropolitan Police Service (MPS) and City of London Police (CoLP) has stepped up its enforcement of advanced stop lines, more commonly known as ‘bike boxes’, to help further improve safety for cyclists on the capital’s roads. Advanced stop lines are the boxes marked on the road with a bike symbol painted inside, located at many traffic lights. The cyclist has a stop line several feet ahead of the line used by other vehicles in order to give cycles more space so they can be s
  • Virginia and Transurban spend $1bn on infrastructure to improve congestion
    January 31, 2019
    The US state of Virginia and road operator Transurban are investing more than $1 billion in four projects to help tackle congestion on the I-495 and I-95. The partners want to establish a 90-mile network of connected Express Lanes throughout Northern Virginia and Fredericksburg by 2022. Virginia Department of Transportation (VDoT) and Transurban have signed an agreement for the first project, Capital Beltway Express Lanes Northern Extension. The new 2.5-mile area will offer four general purpose lanes and
  • Iteris’ gets Orange County in sync
    August 19, 2014
    David Crawford welcomes progress in cross-boundary coordination Iteris’ US$1.4 million contract for traffic signal synchronisation on Newport Boulevard, California is evidence of an acceleration of activity by the Orange County Transportation Authority (OCTA) in coordinated traffic management. It also continues the US traffic management specialist’s established technical relationship with the area’s prime transportation agency.