Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

For more information on companies in this article

Related Content

  • Airbiquity adds Inrix and Parkopedia to its connected car content
    August 22, 2014
    US-based connected car services supplier, Airbiquity is to integrate two industry-leading geo-aware content providers into its Choreo connected car services delivery platform, making Inrix’s traffic information and driver services and the parking information services of Parkopedia available to Airbiquity’s automotive OEM customers deploying the its Driver Experience infotainment service. Leveraging the Airbiquity content portfolio, automotive OEMs can now easily configure both INRIX traffic and Parkopedia p
  • Omniflow shows OmniCharger solution at Intertraffic
    April 18, 2024
    The Portuguese-made OmniCharger is sustainable and provides resilience in times of power disruption. Both are equally important in a world less predictable world, says Pedro Ruao, founder and chief executive of the manufacturer, Omniflow.
  • Washington I-90 tolling could start in 2015
    January 2, 2013
    A planned Washington Department of Transportation (WSDOT) study could make tolling on interstate-90 bridges over Lake Washington and across Mercer Island all but inevitable. Tolling on the state route 520 floating bridge began about a year ago and transportation officials have been closely monitoring two factors: the routes that drivers are now using and the cost to replace the aging 520 bridge. In response, the state legislature last session asked for a new environmental study to review the affects of toll
  • Heathrow airport upgrades car park systems
    December 1, 2015
    APCOA Parking UK, operator of of Heathrow Airport’s parking facilities, has chosen APT Skidata, to re-equip nine staff car parks and refresh a further 1,580-space short stay multi-storey commercial passenger car parks serving Heathrow’s Terminal 3 (T3). Within the staff car parks, which need to accommodate 34,000 employees and currently use multiple parking systems, APT SkiData is installing its Column.Lite entrance systems at entry lanes, equipping them with radio frequency identification devices (RFID)