Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • September 21, 2012
    Seattle DOT chooses Peek ATC1000
    Seattle Department of Transportation has chosen the Peel Traffic ATC-1000 controller for a King County Metro Rapid Ride corridor project. Rapid Ride is Seattle’s bus system; buses send signals to traffic lights so green lights stay green longer, or red lights switch to green faster. The systems have many advanced features including transit signal priority to help synchronise traffic lights with an approaching Rapid Ride bus, enabling the traffic signal controller to provide an effective transit priority re
  • June 15, 2016
    VTA demonstrating Smart Stop technology at ITS America San Jose
    The Santa Clara Valley Transportation Authority (VTA) is showing conference attendees how its Smart Stop technology can tell bus drivers that someone is waiting at a particular stop, improving the rider experience while saving fuel costs. The Smart Stop demonstration is designed to highlight Vehicle to Infrastructure (V2I) and Vehicle to Vehicle (V2V) solutions using dedicated short range 5.9 GHz Wi-Fi communications. It was built in partnership with Renesas Electronics America, a semiconductor supplier, a
  • September 12, 2016
    US DOT announces funding for bus projects
    The US Department of Transportation’s Federal Transit Administration (FTA) has selected 61 projects in 41 states, the Virgin Islands and Indian Country to receive a share of nearly US$211 million to replace, rehabilitate and purchase transit buses and related equipment and construct bus-related facilities. Among the projects selected to receive 2016 Bus Program funding are the Kentucky Transportation Cabinet, which will receive approximately US$5.8 million for the expansion and replacement of transit veh
  • January 23, 2015
    Alstom wins new Kochi metro line contracts
    Alstom has been awarded two contracts worth over US$73 million by Delhi Metro Rail Corporation (DMRC) to supply signalling, telecom and electrification solutions for the new Kochi metro line. The projects will be implemented in early 2016 and commercial service is scheduled to begin in March 2016. The contracts include 25 Alstom Metropolis trains which will circulate on the new Kochi metro line which is 25 kilometres long and includes 22 stations. These trains will carry up to 15,000 passengers per hour