Skip to main content

Transit hub promised in San Diego area

San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
January 18, 2013 Read time: 2 mins
San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations.  This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces.

 “This will be our flagship station,” said Frank Owsiany, who oversees station improvements along the inland corridor for the 1789 San Diego Association of Governments, the region’s transportation planning agency.

Construction on what is said to be the ultimate I-15 transit hub, is expected to begin by late February or early March and should last about a year, Owsiany said.

The project is timed to be ready for the early 2014 launch of an expanded rapid bus service along I-15. That service promises to increase the frequency and shorten the routes of express buses that ferry passengers from stations in Escondido, Rancho Bernardo and other points south along the I-15 Express Lanes to job centers in Sorrento Valley and downtown San Diego.

The Sabre Springs project will require the closure of the station’s 150 parking spaces, which will be temporarily replaced at three park and rides along Sabre Springs Parkway. Owsiany said the station ramps that connect drivers to the freeway’s express lanes will remain open during construction.

Once complete, the parking garage will offer 537 spaces to go along with 93 additional surface lot spaces. Solar panels will be added on top of the structure, providing shade for cars on the top level, as well as providing a power source, he said.

Owsiany added that drivers will be able to call and reserve smart parking spots inside the station, where stalls will be lighted either green or red to show whether they have been reserved.

Related Content

  • March 2, 2015
    First full-scale Hyperloop test track ‘planned for 2016’
    According to website The Verge, Hyperloop Transportation Technologies (HTT) has secured land for the first full-scale Hyperloop, planned for a 2016 launch in the California model town of Quay Valley. Building off Elon Musk's freely available designs, the crowdfunded company has marked out a five-mile stretch of Quay Valley adjacent to California's Interstate 5 freeway as a place where the innovative transportation system can be deployed. If successful, it would be the first full-size implementation of Musk'
  • August 6, 2015
    Growth of smart parking market and parking reservation systems
    ReportsnReports.com’s latest research report, Global Smart Parking Market 2015-2019 says increased use of data analytics to optimise parking is one of the key trends being witnessed in this market across the globe. The research discusses trends, forecasts and growth prospects segmented by geography along with information on leading players of the worldwide industry. Data analytics software is predominantly used these days to provide better parking facilities to consumers. Data analytics provide an approp
  • January 4, 2016
    Arizona chooses consortium for its largest-ever highway project
    The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
  • January 23, 2012
    Hard shoulder running aids uniform traffic flow and safer driving
    David Crawford detects a market for European experience. Well-established now in at least three European countries, Hard Shoulder Running (HSR) on motorways is exciting growing interest in the US. A November 2010 Report to Congress by the Federal Highway Administration (FHWA), on the Efficient Use of Highway Capacity, notes the role of HSR in the European-style Active Traffic Management (ATM) strategies now being recommended for implementation in the US where, until recently, they were virtually unknown.