Skip to main content

Singapore's first smart car park & EV charging system launched

ST Engineering is building GoParkin network at NTU Singapore's campus
By Adam Hill May 9, 2023 Read time: 3 mins
The system brings together car parking and EV charging on a single app

ST Engineering and Nanyang Technological University, Singapore (NTU Singapore) has deployed Singapore’s first integrated smart car park and electric vehicle charging system, GoParkin, on NTU’s main campus.

It allows EV users to park, charge and pay on a single mobile app, eliminating the need for separate parking and EV charging apps.

ST Engineering’s urban solutions business will build and operate the university’s campus-wide EV charging network, as part of NTU’s sustainability goals.

NTU is committed to achieving a 50% reduction in carbon emissions by 2035: EV users will be able to find available parking and EV charging points at NTU, charge their vehicle, monitor charging status, and make payment easily through the app.

Six EV charging points have been installed at NTU’s Jurong campus, with eight more to be rolled out at four more car parks by June 2023.

Most car parks will be fitted with 11kW AC chargers while one will have a 120kW DC charger for fast charging.

There are plans to extend the EV charging network to more car parks to keep pace with future charging demand.

"Our integrated solution benefits both motorists and car park operators, addressing the pain point of having to use multiple parking and charging platforms," says Ang Kim Siah, head of mobility road, urban solutions, ST Engineering.

"With our expertise in smart car park and EV charging systems, we are well-positioned to provide the market with an integrated, reliable and cost-effective solution that addresses the evolving challenges of drivers, car park owners and operators sustainably."

Tan Aik Na, senior vice president (administration), NTU Singapore, said: “The hassle-free park and charge system will bring greater convenience as EV adoption increases on our campus.”

In 2020, ST Engineering and NTU launched Singapore’s first barrier-free smart car park system at NTU’s Jurong campus and is currently operational at all 59 NTU car parks across its Jurong, Novena and one-north campuses, covering over 4,000 parking lots.

With ANPR technology, GoParkin EV users at NTU can automatically start a charging session when the charging cable is connected to their vehicle, removing the need to manually activate.

To eradicate EV charge hogging, ANPR can also detect and identify EVs that have completed their charging session but continue to occupy the lot, as well as non-EVs that occupy an EV charging lot.

Licence plates are automatically routed to the parking enforcement team for follow-up. 

In addition to the cost-effectiveness of ANPR, the cloud-based GoParkin system provides operational and maintenance cost savings to NTU in various ways, ST Engineering says.

These include interoperability with other EV charging hardware, and the provision of a real-time, centralised view of EV charging and car park operations across NTU’s locations on a unified platform.

The system also provides advanced analytics that generate insights such as EV charging patterns to optimise operations and revenue streams, to facilitate planning of future services.

For more information on companies in this article

Related Content

  • Key to EV roll-out is understanding drivers
    October 22, 2021
    Understanding EV technology and driver behaviour will be key to building out the world’s charging infrastructure. Andrew Stone finds out why from Bret Scott at Wejo
  • ChargeWheel sparks mobile EV charging in San Francisco
    August 16, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 elec
  • The Asia-Pacific poses a multitude of ITS challenges
    May 30, 2014
    The Asia-Pacific ITS Forum and Exhibition in Auckland, New Zealand, provided a focus for the region’s ITS Associations. Mary Bell reports. In late April, ITS New Zealand hosted the 13th Asia-Pacific ITS Forum and Exhibition in Auckland. Around 350 delegates from 24 nations gathered to share and advance ITS applications on both strategic and technical levels and to discuss the differing and various challenges faced in the region.
  • Countering truckers’ parking conundrum
    May 3, 2017
    Colin Sowman hears about a new truck parking information system being piloted across eight states. Legislation limits truck drivers’ hours with the result that they are often caught in a situation where they need to stop either for a break or an overnight rest. But as truck parking is in short supply, truck drivers spend an average of 56 minutes a day searching for available spaces and are often faced with the choice of driving beyond their permitted hours or parking illegally.