Skip to main content

CurbFlow looks at PUDO in Washington, DC

The District Department of Transportation (DDoT) in Washington, DC is working with CurbFlow to carry out the next phase of its kerbside pick-up and drop-off (PUDO) programme. DDoT says the programme allocates kerbside space for PUDO activities, allowing passenger and commercial loading to occur at the kerb and out of travel lanes. Jeff Marootian, DDoT director, says: “By exploring new kerbside management options through this partnership with CurbFlow, DDoT is able to keep traffic flowing, maximise effic
July 4, 2019 Read time: 2 mins

The 2134 District Department of Transportation (DDoT) in Washington, DC is working with CurbFlow to carry out the next phase of its kerbside pick-up and drop-off (PUDO) programme.

DDoT says the programme allocates kerbside space for PUDO activities, allowing passenger and commercial loading to occur at the kerb and out of travel lanes.

Jeff Marootian, DDoT director, says: “By exploring new kerbside management options through this partnership with CurbFlow, DDoT is able to keep traffic flowing, maximise efficiency of our kerbside space.”

CurbFlow will analyse demand at nine locations across the district where commercial loading and PUDO activities for delivery services can lead to double parking.

From 1 August, parking will be removed for 12 weeks to create CurbFlow loading zones for commercial activities at the locations, which include 1200 block of 1st Street SE and 1100 block of 4th Street SW. The participants will use the CurbFlow %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external app false https://www.curbflow.com/DC false false%> to coordinate kerb time.

CurbFlow will collect data from each zone looking at safety, utilisation, productivity and equitable access. The DDoT intends to evaluate this data to determine the next steps for the city’s curb usage policies.

For more information on companies in this article

Related Content

  • Irdeto and Conjure promote Keystone vehicle access solution
    March 19, 2018
    Irdeto and Conjure are using Intertraffic to present what they claim is the most secure, policy-based vehicle access and safety solution in the connected transport industry. Using a mobile device with a companion application, the solution eliminates the need for physical keys to a car while also providing car and fleet owners with the ability to securely and intuitively provision and manage a host of new car sharing/car riding experiences. Keystone combines secure, tamper-proof policy management that
  • Bosch to trial driverless tech on Australia’s high-speed rural roads
    January 24, 2019
    Bosch has received an automated driving system (ADS) permit from the Victorian government to test automated vehicle technology on high-speed rural roads in the south-eastern Australian state. Bosch is to use a $2.3 million grant from the Connected and Automated Vehicle (C/AV) Trial Grants Programme to develop the technology, which will be tested later this year. The C/AV programme funded through the government’s $1.4 million Towards Zero Action Plan – an initiative which provides guidelines on how V
  • Uber may never be profitable … admits Uber
    April 12, 2019
    Private ride-hailing giant Uber, which is aiming to follow rival Lyft in becoming a public company this year, has warned that it may never be profitable. The candid admission comes in a filing to the US Securities and Exchange Commission (SEC) as Uber prepares for an initial public offering (IPO) which it reportedly hopes will value the company at $100 billion. This potential IPO figure is some way below the $120bn predicted by analysts just last year. And Uber warns: “We have incurred significant loss
  • SES America webinar - integrated solar power in dynamic travel time systems
    April 23, 2015
    SES America is offering an ITS engineering webinar on 30 April at 1000 central time. The webinar focuses on a state-wide project exploring the developmental stages and lessons learned on the first phase with the changes to be implemented on the final execution. The webinar will provide information on: Building a reliable solar power system with proper specifications; essentials of solar power design for utilisation on any ITS device; site evaluation and sign design; and lessons learned - the dos and don'ts