Skip to main content

Barriers tailor-made for Swedish motorway project

Traffic management barriers developed by Belgian access control systems are being used on the Norra Länken motorway project in Sweden, supplied through its local partner Swarco. Built in cooperation with the city of Stockholm and co-financed by the European Union, Norra Länken is five kilometres long with four kilometres in tunnels and is said to be northern Europe’s largest road tunnel project. Two types of barrier have been installed on the project, the BL77 security barrier and the extra long BL52
December 4, 2014 Read time: 2 mins
RSSTraffic management barriers developed by Belgian access control systems supplier 3197 Automatic Systems are being used on the Norra Länken motorway project in Sweden, supplied through its local partner 129 Swarco.

Built in cooperation with the city of Stockholm and co-financed by the 1816 European Union, Norra Länken is five kilometres long with four kilometres in tunnels and is said to be northern Europe’s largest road tunnel project.

Two types of barrier have been installed on the project, the BL77 security barrier and the extra long BL52 barrier. The BL52 is specifically designed for the physical closure of large roads, tunnels and highways. Its visibility is reinforced by high-luminosity LEDs and reflective strips. The BL52 is used for the closure of routes up to 14 metres wide. For the Norra Länken project, the barrier was tailored to meet the client's technical specifications. Its arm is eight metres wide and opening speed is less than seven seconds.

The barriers are integrated with the sophisticated traffic control and security systems deployed in the region and nationwide and are installed along the roads, inside the tunnels and at the tunnel entrances.

"Norra Länken is a challenging project with very complex technical requirements. I'm very proud to be part of this project,” says Wim Teurlinckx, sales manager Automatic Systems' Northern Countries.

For more information on companies in this article

Related Content

  • Kapsch equips high speed line in Spain with latest train communication technology
    April 2, 2012
    Kapsch CarrierCom has successfully implemented the latest train security and communication technology on the first high speed line in the Galicia region in the North West of Spain. The route between Orense and Santiago covers 87 km of tracks with 29 km of tunnels through a very mountainous area. Kapsch has been the Base Station Subsystem (BSS) GSM-R system turnkey supplier including network design, network integration and optimisation to the project. The company has also supplied all site infrastructure req
  • Bombardier and Lilee Systems team up on New York MTA positive train control
    May 9, 2014
    Bombardier Transportation has selected Lilee Systems to design and deploy the communications systems for the New York Metropolitan Transportation Authority’s (NYMTA) positive train control (PTC).
  • South Africa's first multi-lane free-flow tolling top of the line
    February 3, 2012
    Kapsch's Kjell Arnesson talks about the first multi-lane free-flow tolling project in South Africa. In South Africa, installation is ongoing as part of the Gauteng Freeway Improvement Project (GFIP) of the country's first Multi-Lane Free-Flow (MLFF) tolling system.
  • ITS-NY Announces 2012 Project of the Year Award Winners
    June 13, 2012
    The Intelligent Transportation Society of New York (ITS-NY) has announced the 2012 ITS-NY Project of the Year Winners at its Nineteenth Annual Meeting and Technology Exhibition in Saratoga Springs, NY. “These winning projects feature ITS and technologies at work in New York State to improve traveller mobility and safety, as well as the efficiency of New York State’s transportation system across all modes of travel,” said Dr Isaac Takyi, ITS-NY president. Winning Projects were announced in the following ITS