Skip to main content

WSP USA awarded Illinois Tollway system consulting engineer contract

The Illinois State Toll Highway Authority has appointed WSP USA as the agency’s independent consulting engineer for engineering projects associated with the Illinois Tollway. Under the 54-month contract, WSP will work on a number of current and future tollway projects planned by the Authority. These include the 22-mile Tri-State Tollway Expansion, set to begin design in 2018, the ongoing design and construction of the Elgin O’Hare Western Access Project
September 15, 2017 Read time: 1 min

The Illinois State Toll Highway Authority has appointed WSP USA as the agency’s independent consulting engineer for engineering projects associated with the Illinois Tollway.

Under the 54-month contract, WSP will work on a number of current and future tollway projects planned by the Authority. These include the 22-mile Tri-State Tollway Expansion, set to begin design in 2018, the ongoing design and construction of the Elgin O’Hare Western Access Project, and other projects included in the Move Illinois Capital Program.

WSP will be responsible for multiple tasks including environmental reviews and assistance, plan reviews, project management, drainage and structural engineering support, and manual reviews and updates. Additional technical services will include review of overweight permits, project control support and construction audits. WSP will also oversee annual inspections of the tollway system and facilities and provide an annual report of the major accomplishments, state of repair and plans for upcoming work.

Related Content

  • Covid turns tolls cashless
    December 23, 2021
    When coronavirus hit, Pennsylvania Turnpike Commission made its long-planned e-tolling system permanent; this made sense, but it was still a difficult decision, explains the organisation’s Carl DeFebo
  • Indra wins in India with two transport and traffic contracts
    November 30, 2015
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with
  • IRD to maintain Illinois’ WIM systems
    August 3, 2016
    The Illinois Department of Transportation (IDOT) has awarded International Road Dynamics (IRD) a US$3,377,105 contract to maintain and maximize performance of the state-wide weigh-in-motion (WIM) network. IDOT currently has 34 active IRD WIM systems that will be covered under this agreement. IRD will be responsible for the repair, maintenance, and service activities of the in-road scales and sensors, roadside electronics, queue detection and camera surveillance systems, and PrePass preclearance weighing
  • Cost saving multi-agency transportation and emergency management
    May 3, 2012
    Although the recession had dramatically reduced traffic volumes in the past few years, the economy was on the brink of a recovery that portended well for jobs but poorly for traffic congestion. Leaders of four government agencies in Houston, Texas, got together to discuss how to collectively cope with the expected increase in vehicles on the road. "They knew they couldn't pour enough concrete to solve the problem, and they also knew the old model of working in a vacuum as standalone entities would fail," sa