Skip to main content

Unibuss pilots two electric models in Oslo

Unibuss has received the first of two electric buses (EBs) which will both run on line 74 between Mortensrud and Week, in Olso, Norway. The pilot will gather experiences of the operation and is part of a project that will run six EBs in the future under the direction of journey planner Ruter.
November 6, 2017 Read time: 1 min
Unibuss has received the first of two electric buses (EBs) which will both run on line 74 between Mortensrud and Week, in Olso, Norway. The pilot will gather experiences of the operation and is part of a project that will run six EBs in the future under the direction of journey planner Ruter.


The buses will be used on a test run within the next few weeks before being available to the public.

Both EBs are 12 meters long and will be charged with 300-kilowatt pantographs at the end stops, which the company claims are six times as powerful as regular electric car charging stations and allow buses to be fully charged within five to eight minutes.

A charging station will be located at Mortensrud and in Vika; as well as the Klemetsrud garage so that the buses can charge overnight.

Related Content

  • Windsor is first North American city to launch BYD all-electric buses
    May 8, 2012
    Windsor Mayor Eddie Francis has signed a letter of intent to purchase up to 10, BYD 40-foot electric buses for city transit services in 2012, the first city in North America to launch long-range, all-electric buses. The agreement also opens talks to bring manufacturing of BYD buses to the Ontario region in the near future. Transit Windsor has the unique distinction of running in Canada as well as in Detroit, making this launch one that serves on both Canadian and United States’ roads.
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • The UK’s busiest crossing adopts free flow charging
    April 30, 2015
    Colin Sowman looks at the transition to free-flow charging on the Dartford Crossing, a notorious congestion blackspot on the UK motorway network. The Dartford Crossing, where London’s orbital M25 motorway crosses the lower reaches of the River Thames 32km (20 miles) to the east of Central London, has long been a major source of congestion. Now, to alleviate the congestion caused by some 50 million crossings per year, the Highways Agency has adopted a free-flow charging system - but the Crossing’s location a