Skip to main content

Siemens to develop infrastructure for London's ULEZ

Siemens will develop software for London’s Ultra Low Emission Zone (ULEZ) with the intention of ensuring that the necessary infrastructure is in place for when it goes live in April 2019. The zone will require vehicles, barring some exceptions, to meet exhaust emissions standards or pay a daily charge when travelling into central London. Work will now commence over the next 12 months to allow the software to be deployed for service preparation activities leading up to the scheme. The ULEZ is intended
March 14, 2018 Read time: 2 mins
189 Siemens will develop software for London’s Ultra Low Emission Zone (ULEZ) with the intention of ensuring that the necessary infrastructure is in place for when it goes live in April 2019. The zone will require vehicles, barring some exceptions, to meet exhaust emissions standards or pay a daily charge when travelling into central London.


Work will now commence over the next 12 months to allow the software to be deployed for service preparation activities leading up to the scheme.

The ULEZ is intended to reduce exhaust nitrogen oxide and particulate matter emissions to make the area a safer and better place to live, work and visit. It aims to be especially beneficial to younger and older people as well as those with respiratory problems and residents in high pollution areas. The reduced emissions are also said to benefit areas outside of the zone as traffic moving into the ULEZ also comes from outside of it.

Matthew Vincent, Siemens ITS, sales and marketing director, said: “As cities continue with their aspirations to improve the air quality, increasingly they need to revert to the implementation of a Clean Air Zone (CAZ) or Low Emission Zones (LEZ). Siemens is proud that its technology has been chosen in London and we look forward to working with other cities and regions in developing their own implementation of scalable LEZ/CAZ solutions that support their local needs”.

For more information on companies in this article

Related Content

  • Time to set standards for mapping noise and stick to them
    February 25, 2016
    Designer and provider of acoustics and air pollution simulation software for environmental modelling, SoundPlan, is calling on the bodies responsible for setting noise standards around the world to ensure that they implement and maintain high quality standards with thorough test procedures and scenarios. According to SoundPlan, the USA’s Federal Highway Administration’s Traffic Noise Model (TNM) is identified as an example of poor practice in this arena. When testing the standards SoundPlan software engi
  • Improving the positional accuracy of GNSS road user charging
    July 23, 2012
    The European GINA project is intended to address and overcome many of the institutional, technical and public acceptance hurdles currently faced by satellite-based road user charging schemes. Dave Tindall and Denis Naberezhnykh, TRL, and Laure Dezes, ERF, write. Pay-as-you-drive Road User Charging (RUC), whereby demand (or congestion) is managed by applying appropriate tariffs in order to encourage drivers to make their journeys at less busy times, on less congested routes or even on different modes, could
  • Wellington City Council chooses Telensa’s Smart Light System
    November 28, 2017
    Telensa has been selected by Wellington City Council in the UK to deploy its intelligent streetlighting system which according to the company pays for itself in reduced energy maintenance costs. The project will start in November 2017 and is due for completion in June next year. The Telena Planet is an end-to-end system that consists of wireless nodes connecting individual lights, a dedicated wireless network owned by the city, and a central management application. It aims to improve quality of service
  • Wellington City Council chooses Telensa Smart Light System
    November 28, 2017
    Telensa has been selected by Wellington City Council in the UK to deploy its intelligent streetlighting system which according to the company pays for itself in reduced energy maintenance costs. The project will start in November 2017 and is due for completion in June next year. The Telena Planet is an end-to-end system that consists of wireless nodes connecting individual lights, a dedicated wireless network owned by the city, and a central management application. It aims to improve quality of service