Skip to main content

Siemens to develop infrastructure for London's ULEZ

Siemens will develop software for London’s Ultra Low Emission Zone (ULEZ) with the intention of ensuring that the necessary infrastructure is in place for when it goes live in April 2019. The zone will require vehicles, barring some exceptions, to meet exhaust emissions standards or pay a daily charge when travelling into central London. Work will now commence over the next 12 months to allow the software to be deployed for service preparation activities leading up to the scheme. The ULEZ is intended
March 14, 2018 Read time: 2 mins
189 Siemens will develop software for London’s Ultra Low Emission Zone (ULEZ) with the intention of ensuring that the necessary infrastructure is in place for when it goes live in April 2019. The zone will require vehicles, barring some exceptions, to meet exhaust emissions standards or pay a daily charge when travelling into central London.


Work will now commence over the next 12 months to allow the software to be deployed for service preparation activities leading up to the scheme.

The ULEZ is intended to reduce exhaust nitrogen oxide and particulate matter emissions to make the area a safer and better place to live, work and visit. It aims to be especially beneficial to younger and older people as well as those with respiratory problems and residents in high pollution areas. The reduced emissions are also said to benefit areas outside of the zone as traffic moving into the ULEZ also comes from outside of it.

Matthew Vincent, Siemens ITS, sales and marketing director, said: “As cities continue with their aspirations to improve the air quality, increasingly they need to revert to the implementation of a Clean Air Zone (CAZ) or Low Emission Zones (LEZ). Siemens is proud that its technology has been chosen in London and we look forward to working with other cities and regions in developing their own implementation of scalable LEZ/CAZ solutions that support their local needs”.

For more information on companies in this article

Related Content

  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.
  • Cost benefit: Toronto retimings tame traffic trauma
    July 11, 2018
    Canada’s largest city reckons that it is saving its taxpayers’ money simply by altering the way traffic lights work. David Crawford reviews Toronto’s ambitious plans to ease congestion. Toronto, Canada’s largest metropolis (and the fourth largest in North America), has saved its residents CAN$53 (US$42.4) for every CAN$1 (US$0.80) spent over a 2012-2016 traffic signal retiming programme, according to figures released by its Transportation Services Division. The programme covered 1,275 signals (the city’s to
  • Developing new detection and monitoring technologies
    November 21, 2012
    Established detection and monitoring technologies continue to evolve, but is it time to challenge their supremacy and take a serious look at less conventional ITS? Andy Graham considers the options with Jason Barnes. For ITS system providers, the most potentially lucrative markets over the next few years are going to be the BRIC (Brazil Russia India and China) group of countries, all of which are building many miles of new roads, applying tolling to existing ones (8,000km in China alone) and implementing w
  • Gearing up for IntelliDrive cooperative traffic management
    February 1, 2012
    Beginning in the first quarter of 2010 it became evident that the IntelliDrivesm programme direction had been reestablished, by the USDOT's ITS Joint Program Office (JPO), after being adrift for a few years. The programme was now moving toward a deployment future and with a much broader stakeholder involvement than it had exhibited previously. By today not only is it evident that the programme was reestablished with a renewed emphasis on deployment, it is also apparent that it is moving along at a faster pa