Skip to main content

Latvia takes delivery of speed enforcement

In an effort to improve safety on Latvian roads, local company Reck has been awarded US$1.4 million contract to supply the Road Traffic Safety Directorate in Riga with 20 stationary speed cameras
October 13, 2014 Read time: 1 min

In an effort to improve safety on Latvian roads, local company Reck has been awarded US$1.4 million contract to supply the Road Traffic Safety Directorate in Riga with 20 stationary speed cameras.

The contract includes 16 radar-based cameras, manufactured by 1679 Gatso, which will be delivered by the end of 2014, and a further four laser-based mobile speed cameras.

According to the Road Traffic Safety Directorate, while fixed speed cameras are important to road safety, portable speed cameras are also important along with public education and infrastructure upgrades.

For more information on companies in this article

Related Content

  • Barrier-free truck tolling for Spain's Basque region
    October 11, 2024
    MLFF system covers 146 lanes and has been processing 1.4 million transactions daily
  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • From coast to coast: US states embrace automated enforcement for safer roads, says Verra Mobility
    September 12, 2023
    The concept of Vision Zero has hit a pothole in the US – but there is hope for a safer future, says Jon Baldwin, executive vice president, government solutions, at Verra Mobility
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.