Skip to main content

Jenoptik wins large traffic monitoring order in Saudi Arabia

Jenoptik's traffic solutions division has received a major order for systems and equipment for traffic monitoring from the Kingdom of Saudi Arabia. The customer is Dallah Trans Arabia, located in Jeddah, and the scope of supply includes several hundred stationary systems for monitoring red light and speed violations. About 100 systems for mobile and stationary speed monitoring as well as a comprehensive software solution of Jenoptik have already been in use in Saudi Arabia since last year. The total equipme
May 16, 2012 Read time: 2 mins
79 Jenoptik’s traffic solutions division has received a major order for systems and equipment for traffic monitoring from the Kingdom of Saudi Arabia. The customer is Dallah Trans Arabia, located in Jeddah, and the scope of supply includes several hundred stationary systems for monitoring red light and speed violations. About 100 systems for mobile and stationary speed monitoring as well as a comprehensive software solution of Jenoptik have already been in use in Saudi Arabia since last year. The total equipment order, exceeding US$28 million, will be delivered and installed through this year and next.

Jenoptik is supplying equipment for the Saudi Arabian ATVAM project (Automated Traffic Violations Administering and Monitoring) which is considered to be the largest and technically most ambitious single project ever in the history of traffic law enforcement worldwide. Over the next years the project aims at substantially reducing the number of killed or injured people on Saudi Arabia’s roads.

During the competitive tender for this major project, the Jenoptik division benefitted from its leading market position and won out over numerous competitors. A key component of the systems ordered are the 3D Tracking Radar Sensors which have been recently developed by Jenoptik. These non-invasive sensors can simultaneously monitor several lanes for speed and red light violations.

For more information on companies in this article

Related Content

  • Mexico opts for Sensys enforcement
    September 1, 2014
    Sensys Traffic is to supply a customer in Mexico with speed and red-light monitoring systems. The order, worth around US$174,000, was received after successful testing had been carried out with Sensys' partner in Mexico following a pilot order in the previous year.
  • IntelliDrive and HOT lanes - the next generation?
    January 30, 2012
    Janet Banner, Metropolitan Transportation Commission, and Christopher Hill, Mixon Hill, Inc., outline efforts to explore the use of IntelliDrive technologies in HOT lane applications. On 21 October last year more than 100 transportation professionals came together for a workshop, either in person or via a webinar, to discuss the potential role of IntelliDriveSM technologies in enhancing the operations of High-Occupancy Toll (HOT) lanes. The discussions focused on a White Paper, commissioned by the Metropoli
  • D-cop now TUV certified in Italy
    May 20, 2014
    Testing carried out on D-cop, Intertraff’s radar based speed enforcement camera with the aim with the objective of accurately verifying how D-cop measures the speed of vehicles showed an average error 0.0001 per cent at speeds up to 242.47 km/h. A Porsche S was used for the test at the Porsche Engineering speed track in Apulia, Italy by TÜV Italy, part of the TÜV SÜD group, an independent certification and testing body providing certification services for quality, energy, environment, safety and products
  • Europe's electronic toll service closer to operational reality
    November 7, 2012
    After much debate and delay, a unifying European Electronic Toll Service is now finally on the horizon, says ASFiNAG’s Klaus Schierhackl. Here, he talks with Jason Barnes about what that might mean. Aworkable European Electronic Toll Service (EETS) which will allow truck drivers to travel across the continent and pay tolls using a single account and OnBoard Unit (OBU) was originally timetabled to be in place and operating by October of this year. A lack of urgency from some of the stakeholders involved in t