Skip to main content

Crown International to supply variable-height masts for smart motorways

Crown International has been awarded a US$547,000 (£375,000) contract by Balfour Beatty to supply and install variable height dual unit enabled PTZ (pan-tilt-zoom) masts, as part of the Smart Motorways project on the M5. The masts will be used between Junctions 2 and 4a and will be delivered in 2016. Forty-six PTZ 15 metre masts are to be installed along the M5. Each mast will be used to mount infrared equipment and lane monitoring cameras and has been designed for roadside maintenance by a single operative
April 27, 2016 Read time: 2 mins
1908 Crown International has been awarded a US$547,000 (£375,000) contract by 3902 Balfour Beatty to supply and install variable height dual unit enabled PTZ (pan-tilt-zoom) masts, as part of the Smart Motorways project on the M5. The masts will be used between Junctions 2 and 4a and will be delivered in 2016.

Forty-six PTZ 15 metre masts are to be installed along the M5. Each mast will be used to mount infrared equipment and lane monitoring cameras and has been designed for roadside maintenance by a single operative, reducing the need for costly lane closures and improving safety for maintenance workers.

Crown says the mast has several unique features designed to provide greater reliability of operation than traditional equipment.  The integrated cable management system means cables remain in place when the platform is lowered or raised for maintenance, eliminating the need to disconnect wires or power supplies. It also features a fully-integrated winch and braking system, meaning it can be maintained by a single maintenance worker, thereby reducing operating costs.

For more information on companies in this article

Related Content

  • Ideagen software used by ConnectPlus for M25 project
    June 4, 2018
    UK technology company Ideagen's Coruson software will be utilised by ConnectPlus consortium to improve safety, quality and environmental processes for the renewal of the M25 motorway. Around 650 users will report into the quality management system. ConnectPlus is managing the 25-year phase of the Design, Build, Finance and Operate upgrade and maintenance project. The firm helps supervise subcontractors as well as provide maintenance work and small improvement schemes. Phillip Ross, head of health, sa
  • Computer technology increasingly aids traffic management
    February 3, 2012
    Alan Perrott, Tyco Fire & Integrated Solutions (UK) Ltd, looks at trends in CCTV technology for traffic surveillance applications
  • Reversible express lanes and open road tolling combat congestion
    March 2, 2012
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway
  • Solar road studs aid night time road safety on the M20
    October 23, 2012
    UK company, Astucia, part of the Clearview Traffic Group, and Balfour Beatty Mott MacDonald has installed over 4,000 Astucia SolarLite road studs on the M20 junctions 8 to 9 between Ashford and Maidstone, on behalf of the UK Highways Agency. This section of the motorway lacks street lighting increasing the potential risk for night time accidents. The project involved upgrading the existing road markings and road studs to address the high number of collisions recorded in the dark and wet conditions. The exis