Skip to main content

Contract awards for ATS

The city of Annapolis, Maryland has awarded American Traffic Solutions (ATS) for the installation and operation of a red-light safety camera program with an initial term of five years along with provisions for future term extensions. In Texas, the Harris County Department of Education/Choice Partners has exercised its second of four one-year renewal options, ensuring that school districts in Texas that are members of Choice Partners may contract with ATS for school bus stop arm camera programs.
May 8, 2015 Read time: 1 min
The city of Annapolis, Maryland has awarded 17 American Traffic Solutions (ATS) for the installation and operation of a red-light safety camera program with an initial term of five years along with provisions for future term extensions.

In Texas, the Harris County Department of Education/Choice Partners has exercised its second of four one-year renewal options, ensuring that school districts in Texas that are members of Choice Partners may contract with ATS for school bus stop arm camera programs.

For more information on companies in this article

Related Content

  • Report analyses multiple ITS projects to highlight cost and benefits
    March 16, 2015
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S
  • Denver light rail contract awarded
    July 31, 2015
    Denver’s Regional Transportation District (RTD) Board of Directors has approved a US$140 million two-phased contract award to Balfour Beatty Infrastructure (BBII) to design and build the Southeast Rail Extension. Design will begin during the fall with construction expected to start in spring 2016. The Southeast Rail Extension will build an additional 2.3 miles of light rail on the existing Southeast Rail Line south of Lincoln. When complete it will include an end-of-line station at RidgeGate Parkway,
  • Indra wins big in Mexico
    December 20, 2013
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ