Skip to main content

A431 temporary toll road opens

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened. Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attra
August 4, 2014 Read time: 3 mins

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened.

Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attract 1,000 cars a day if it is to break even.

Thought to be the first private road in the UK for 100 years, the road was built in just three days to avoid the hour-long diversion around the roadworks on the key route between Bristol and Bath.

Mr Watts told newspapers: “Building a toll road isn’t easy to do – this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

In a statement, the council said: “This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team are currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • Cost benefit: Wichita eases workzone congestion
    July 8, 2019
    Achieving higher diversion rates has helped one Kansas city to make traffic flow more efficient around workzones. David Crawford examines what’s behind a 10:1 benefit-to-cost ratio in Wichita Around 10% of highway congestion in the US results from delays in workzones, leading to an estimated annual loss of $700 million in fuel costs alone. The lack of accessible real-time traffic information to help motorists minimise their inconvenience – particularly at peak times - is a major contributor. One solut
  • MaaS: 'It's been much easier to convince politicians than we expected'
    August 11, 2021
    As she leaves the Mobility as a Service sector, Piia Karjalainen explains why the user must continue to be the focus – and why we haven’t yet even seen half of the innovations available 
  • CCTV brings transit safety into view
    September 15, 2014
    David Crawford looks at camera-based vulnerable road users protection systems.Safe and efficient operation of road-based transit depends on minimising the risks of incidents involving other vehicles or vulnerable road users such as pedestrians, cyclists and passengers boarding or alighting from buses or trams. The extent and quality of the visibility available to drivers is crucial in preventing and avoiding incidents. Conventionally, they have had to rely on fairly basic equipment - essentially the human
  • Overcoming the toll fatigue paradox
    July 17, 2025
    Why does the most transparent funding mechanism – the simplest, clearest and most intuitively logical – face the strongest public resistance? Tim McGuckin ponders the reasons…