Skip to main content

A431 temporary toll road opens

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened. Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attra
August 4, 2014 Read time: 3 mins

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened.

Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attract 1,000 cars a day if it is to break even.

Thought to be the first private road in the UK for 100 years, the road was built in just three days to avoid the hour-long diversion around the roadworks on the key route between Bristol and Bath.

Mr Watts told newspapers: “Building a toll road isn’t easy to do – this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

In a statement, the council said: “This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team are currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • Enforcement a key part of the road safety solution
    January 31, 2012
    The Partnership for Advancing Road Safety is a new organisation set up in the US to push the national debate on speed and intersection safety, something which hitherto has been absent. Here, executive director David Kelly explains the organisation's work. With moves to address drink/drug driving and the wearing of seatbelts starting to prove successful in the US, the use of inappropriate speed and poor driving at intersections have become responsible for a proportionately greater number of the deaths and in
  • App informs drivers of delays during Long Beach bridge replacement
    June 6, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • Give offending drivers credit for good behaviour
    July 27, 2012
    Andrew Rooke and Dave Marples of Technolution B.V. take a look at what can be done to address a long-standing problem: the all-or-nothing approach of automated enforcement. To start, a brief history of speeding: on 14 November 1896, the first Veteran Car Run was staged in England from London to Brighton. It was organised to celebrate new British legislation to raise the maximum speed of vehicles from four to 14mph while also removing the need for a person waving a red flag to walk in front of the car and wa
  • Evolving Australia's truck weighing programme
    March 1, 2013
    Regulating heavy truck weight isn’t all about sensors in the road… this year marks a significant point in the progression of Australia’s Intelligent Access Programme as its administrators attempt to answer the scheme’s critics. Jon Masters reports. Australia’s Intelligent Access Programme (IAP), the country’s telematics-based system of reg­ulating movement of the heaviest vehicles, is now five years old. The IAP is administered by Transport Certification Australia (TCA) whose general manager for strategic d