Skip to main content

A431 temporary toll road opens

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened. Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attra
August 4, 2014 Read time: 3 mins

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened.

Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attract 1,000 cars a day if it is to break even.

Thought to be the first private road in the UK for 100 years, the road was built in just three days to avoid the hour-long diversion around the roadworks on the key route between Bristol and Bath.

Mr Watts told newspapers: “Building a toll road isn’t easy to do – this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

In a statement, the council said: “This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team are currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • Pioneering sensors collect weather data from moving vehicles
    January 20, 2012
    ITS International contributing editor David Crawford foresees the vehicle as 'sentinel being'
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • Global toll revenues $8.5bn while technology ‘battles’ continue
    April 9, 2014
    ABI Research’s Dominique Bonte talks to Jason Barnes about trends in tolling and how a wider appreciation of technology options is sorely needed. Global Electronic Toll Collection (ETC) solution revenues will grow to $8.5bn by 2018, with ETC becoming a main source of funding for both Intelligent Transport Systems (ITS) and Vehicle-to-X (V2X) cooperative infrastructures, according to a new report from ABI Research (Chart 1). But, says the report’s author, ABI Research vice president and practice director Dom
  • Tolling Matters: Open your eyes - see the possibilities
    September 27, 2022
    Diane Gutierrez-Scaccetti, commissioner of New Jersey DoT and IBTTA president 2022, talks to Adam Hill about the importance of mentoring young people - and why it's good to share pivotal experiences