Skip to main content

A431 temporary toll road opens

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened. Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attra
August 4, 2014 Read time: 3 mins

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened.

Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attract 1,000 cars a day if it is to break even.

Thought to be the first private road in the UK for 100 years, the road was built in just three days to avoid the hour-long diversion around the roadworks on the key route between Bristol and Bath.

Mr Watts told newspapers: “Building a toll road isn’t easy to do – this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

In a statement, the council said: “This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team are currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • RAC report - motorists frustrated with road taxes
    June 13, 2013
    According to the RAC’s 2013 Report on Motoring, the condition of the UK’s motorways and local roads, characterised by the now year-round problem of potholes, ranks as a top concern for motorists. While the cost of driving is understandably still the number one concern for nearly half (46 per cent) of Britain’s motorists, two in five (41 per cent) say maintenance of local roads and motorways is their top spending priority. In addition, 84 per cent of motorists believe their local roads are deteriorating and
  • Mature solutions for emerging economies
    June 8, 2015
    Siemens’ Marcus Welz talks to David Crawford about suitable ITS solutions for emerging economies. Be bold in vision - and output - and user-oriented in practice,” Marcus Welz advises emerging economies planning ITS investments. Says the Siemens Group senior vice president and global sales director for ITS: “Their road users need better, more reliable and safer trips – but without costs increasing too much. The good news is that many countries are already tackling the big issues of traffic and the environmen
  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • Positive incentives an alternative to road user charging?
    February 1, 2012
    The Netherlands has been looking at incentivising rush-hour avoidance. The intention is to better understand road users' motivations and find alternatives to congestion charging. Something significant needs to happen if we are to adequately address the traffic congestion and other issues caused by the ever-rising numbers of vehicles on our roads. Congestion or distance-based charging is seen as one way of managing demand and raising revenue for improvements to transport infrastructure. However, charging is