Skip to main content

A431 temporary toll road opens

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened. Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attra
August 4, 2014 Read time: 3 mins

A temporary toll road linking Kelston with Bath in Somerset, UK, has opened.

Local businessman Mike Watts set up Kelston toll Road Limited to build the 400 metre road, enabling traffic to negotiate the A431 Kelston Road, which has been closed since February because of a landslide. It has cost Kelston Toll Road £150,000 to build the road and Mr Watts estimates it will cost another £150,000 to run the toll road for five months. He plans to charge motorists £2 each way to use the road, which will need to attract 1,000 cars a day if it is to break even.

Thought to be the first private road in the UK for 100 years, the road was built in just three days to avoid the hour-long diversion around the roadworks on the key route between Bristol and Bath.

Mr Watts told newspapers: “Building a toll road isn’t easy to do – this is the first private road in Britain for 100 years. I think people are very grateful that we have taken this risk.”

Bath and North East Somerset Council predict the section of the A431 will be open again by Christmas and has launched an investigation into the toll road, claiming it does not have planning permission and could be dangerous.

In a statement, the council said: “This remains an active landslide, which could move without warning. In the absence of any information from the toll road promoters the council has concerns about the impact of traffic loading on the land above the slip.

“The council is not in a position to support the temporary road option as we have not been provided with any evidence/information to support the application. A temporary toll road requires planning permission and no application has been received.

“In view of public concerns the council’s planning enforcement team are currently investigating this matter. The council has no details to confirm the toll road design meets safety standards and no evidence that insurances are in place for any member of the public who use the private toll road.”

The council added that it had considered a bypass road on the south side of the closure, where it would not increase loading above the landslip, but this was not viable.

Related Content

  • Time for a rethink on road user charging
    February 1, 2012
    There is no value in further US VMT charging trials, except to delay the inevitable. These trials should end after completion of the University of Iowa's National Evaluation of a Mileage-based Road User Charge. There is far greater promise in unleashing private operators to commence profitable, non-tolling services, then using these for toll assessment and collection as fuel distributors are currently used to collect fuel taxation. Bern Grush writes
  • Metric parking wins
    November 29, 2012
    Metric Parking has been successful in winning orders for their pay and display parking machines in the UK and is to supply three local authorities in the south-west of England with their popular Elite pay and display machines. Bristol City Council has ordered the machines for on-street resident parking schemes in the city, using coin operated machines which will have an alpha numeric keypad for vehicle registration entry and will be networked through the Metric ASLAN web back office system.
  • Kenya WIM system cuts four days off journey times
    March 18, 2014
    Shem Oirere looks at how weigh-in-motion is helping to streamline the trucking industry in Kenya. Kenya, East Africa’s largest economy, is streamlining trucking operations on its section of the 8,800km Northern Corridor. It is both reducing the number of weighbridges and automating the remaining ones in an effort to improve efficiency and eliminate corruption.The Northern Corridor is a major gateway through Kenya to the landlocked countries of Uganda, Rwanda, Burundi, Democratic Republic of Congo and Sou
  • Cooperative road infrastructures - progress and the future
    February 1, 2012
    Robert Bertini, deputy administrator of the USDOT's Research and Innovative Technology Administration, discusses the research and deployment paths of cooperative road infrastructures. High-level analysis by the US's National Highway Traffic Safety Administration (NHTSA) of the potential of Vehicle-to-Infrastructure/Infrastructure-to-Vehicle (V2I/I2V) and Vehicle-to-Vehicle (V2V) technologies indicates that V2V could in exclusivity address a large proportion of crashes involving unimpaired drivers. In fact,