Skip to main content

Egis to maintain systems on Poland’s A4 motorway

Poland’s General Directorate of the National Roads and Motorways (GDDKiA) has awarded Egis two contracts for the maintenance of telecommunication, traffic management and tolling systems on 162 kilometres of the A4 motorway between Wroclaw–Katowice in Poland. These contracts cover 68 toll lanes on 13 toll plazas monitored by one operation centre and 80 pairs of emergency roadside telephones located along the motorway. They continue GDDKiA’s intention to bring the A4 up to toll motorway standards and inclu
June 30, 2015 Read time: 1 min
Poland’s General Directorate of the National Roads and Motorways (7570 GDDKiA) has awarded 7319 Egis two contracts for the maintenance of telecommunication, traffic management and tolling systems on 162 kilometres of the A4 motorway between Wroclaw–Katowice in Poland.

These contracts cover 68 toll lanes on 13 toll plazas monitored by one operation centre and 80 pairs of emergency roadside telephones located along the motorway. They continue GDDKiA’s intention to bring the A4 up to toll motorway standards and include maintenance of the telecommunications and traffic management systems until 31 December 2018 and maintenance of the tolling system until 2 November 2018.

For more information on companies in this article

Related Content

  • Inauguration of India’s Yamuna Expressway project today
    August 9, 2012
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • Inauguration of India’s Yamuna Expressway project today
    August 9, 2012
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • Croix-Rousse demonstrates art of tunnel safety
    December 6, 2018
    How do you expand a tunnel when it has reached its traffic limit? Build another tunnel in parallel to it. That, at least, is what Lyon did and opened the 1.7km Croix-Rousse dual-tunnel system in 2013. The smaller, new €283 million tunnel has become a symbol of Lyon’s intention to reinvent itself as one of France’s most innovative mobility centres, said Mathieu Hermen, head of operations at La Metropole de Lyon. Construction of the original two-lane tunnel under one of the city’s most densely populated arro
  • Toll upgrades for Sydney Harbour Bridge and Tunnel
    March 29, 2016
    Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to replace the existing road tolling systems for Sydney Harbour Bridge and Sydney Harbour Tunnel operated by the New South Wales Roads and Maritime Services (RMS). The contract, worth more than US$112 million (€10 million), comprises supply of a new tolling system, as well as maintenance and support for five years. The new tolling solution is expected to be operating by early 2017. Kapsch will deliver its latest tolling technology based on th