Skip to main content

Swarco sets up live-lane running on Germany's A8

System spans 2.8km along hard shoulder of motorway between Karlsruhe and Karlsbad
By David Arminas March 7, 2023 Read time: 2 mins
The set-up consists of four display cross-sections with LED variable VMS, eight pole installations for VMS or camera technology as well as 12 route stations (image: Autobahn GmbH Niederlassung Südwest)

Swarco has installed a temporary hard shoulder clearance, or live-lane running system, on the A8 motorway in southwest Germany for the Die Autobahn highways agency.

The A8 is an important central east-west link in the European transport network. The section between Karlsruhe motorway interchange and Karlsbad junction features a winding route and gradients of around 7.5% and is highly congested with about 110,000 vehicles per day. Traffic flow is often blocked in this section due to slow-moving trucks and there are frequently overtaking manoeuvres and lane changes taking place.

Swarco's system spans 2.8km along the motorway between Karlsruhe and Karlsbad. It consists of four display cross-sections with LED variable message signs (VMS), eight pole installations for VMS or camera technology as well as 12 route stations. In addition to the outdoor equipment, Swarco also provides central control software.

The camera technology is from Fuunkwerke Video Systeme while the operation of all functions is managed by the Autobahn traffic control centre in Stuttgart. Before the hard shoulder lane becomes a live lane, it must be checked by the traffic control centre to ensure that no obstacles are blocking the lane.

Swarco says that the system offers a climate- and resource-friendly possibility for using existing infrastructure more effectively without the need for costly and more permanent expansion of that infrastructure. In fact, notes Swarco, the capacity of the infrastructure can increase up to 30% with such a system.

The first live-lane running took place early last December.

The introduction of live-lane usage on hard shoulders has been controversial among highway safety experts and the public. Early last year, the UK stopped implementation of its so-called smart motorway schemes until safety data has been collected over five years, according to the Department for Transport.

The department said that during this time it will invest €1.08 billion (£900 million) to improve safety on existing All-lane running motorways. The roll-out of new smart motorways will be paused for schemes introduced before 2020. After this five-year period, the government will assess the data and make an informed decision on next steps, it said.

Although available data shows smart motorways are comparatively the safest roads in the country in terms of fatality rates, the government says it "will go further by ensuring current smart motorways without a permanent hard shoulder are equipped with best-in-class technology and resources to make them as safe as possible”.

For more information on companies in this article

Related Content

  • Alliance Traffic Systems shows roadside alerts solution
    April 17, 2024
    A faster, less expensive way of alerting motorists to approaching dangers is being demonstrated by Abu Dhabi-based Alliance Traffic Systems.
  • State of the art ITS technology for Doha tunnel management system
    January 31, 2012
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.
  • Temporary journey time solution aids smart motorway works
    August 12, 2014
    Temporary intelligent transport system (ITS) solutions provider, Mobile Visual Information Systems (MVIS), is to supply its first temporary journey time solution for long-term constant use on a smart motorway project. In partnership with traffic management specialist Vysionics, MVIS developed a temporary journey time solution for continuous operation throughout the two year installation of the smart motorway scheme between junctions 28 and 31 of the M1. The temporary system provides real time journey inf
  • AMG camera technology implemented on major motorways
    June 2, 2015
    UK manufacturer of CCTV transmission systems, AMG, has completed the supply of a range of hybrid transmission systems for P&D Specialist Services for the M1, M3, M60 and M62 motorways to ensure safe traffic flow during roadworks. A total of 329 cameras has been installed over 99 kilometres of the motorways, including a 35 kilometre stretch of the M60/M62 as part of the Manchester smart motorways scheme. A new project to introduce a stretch of managed motorway on a 23 kilometre section of the M1 betwe