Skip to main content

Calls for smart motorway halt grow louder

UK transport select committee says hard shoulder motorways “apparently confuse” drivers
By Ben Spencer November 5, 2021 Read time: 3 mins
Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data are available (© Gorgios | Dreamstime.com)

The UK's Transport Select Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data is available. 

Earlier this year, following several deaths, a UK coroner called for a review of the safety of such highways, which typically feature no hard shoulder.

In a new report, the committee is calling on the Department of Transport (DfT) and National Highways to halt these deployments until data over this period of time is available for the remaining 112 miles of all-lane running motorway introduced before 2020. 

The committee says the UK Government's decision in March 2020 that all new smart motorways will be all-lane running motorways was premature. 

Rollout and safety of smart motorways says the DfT and National Highways should retrofit emergency refuge areas to existing all-lane running motorways to make them a maximum of 1 mile apart, decreasing to every 0.75 miles where physically possible.

It is also urging both parties to insert the emergency corridor manoeuvre into the Highway Code to help emergency services and traffic patrol officers to access incidents when traffic is congested.

The committee also wants them to commission the Office of Rail and Road to conduct an independent evaluation of the effectiveness and operation of stopped vehicle technology.

According to the committee, the office should also evaluate how successful the Government's action plan has been in reducing incidences of live lane breakdowns on all-lane running motorways and reducing the time for which people who breakdown or stop in live lane are at risk. 

The document points out that dynamic hard shoulder motorways “apparently confuse” drivers because it is used unpredictably to tackle congestion. 

A more consistent approach, where the hard shoulder is used at known times, could clarify the situation for drivers without physically removing it.

The report advises the DfT and National Highways to pause plans to convert dynamic hard shoulder motorways until the next Road Investment Strategy. It also suggests they use the intervening period to trial alternative ways in which to operate the hard shoulder to make the rules less confusing.

The committee claims that controlled motors, which retain the hard shoulder and have the technology to regulate traffic, have the lowest casualty rates of all the types of motorway on the strategic road network. 

Therefore, it urges the DfT to carefully consider how the business case for them compares with that for all-lane running motorways.

The group concludes by saying that it is not convinced that reinstating the hard shoulder on all all-lane running motorways will improve safety as the evidence suggests that doing so could put more drivers and passengers at risk of death and serious injury. 

 

For more information on companies in this article

Related Content

  • Regulating rural road use
    June 20, 2016
    David Crawford looks at problems facing indigenous communities and those unfamiliar with driving in rural areas. While it is well known that the fatality rate for road crashes in rural areas is higher than in towns and cities, some groups suffer far more than others. For instance, the rates of death and serious injury from vehicle accidents is much higher for American Indian and Alaska Native (AI and AN) populations living in rural tribal lands than for any of the country’s other ethnic populations. Crashes
  • IRF World Congress 2024: Don't just focus on infrastructure for safety
    October 17, 2024
    Using latest innovative technologies gives hope that deaths can be reduced, says TRB
  • ‘Wrong font’ on signs could overturn speeding fines
    March 11, 2013
    Thousands of UK motorists caught speeding on two stretches of the M62 in Warwickshire could have their convictions overturned because the wrong font was used on the speed limit signs. The Crown Prosecution Service said the signs showed miles per hour (mph) numbers taller and narrower than they should have been, failing to comply with traffic regulations. The regulations governing variable speed limit signs are set out in a government document called Traffic Signs Regulations and General Directions 2002. If
  • Balfour Beatty JV to deliver UK smart motorways package
    July 22, 2015
    The Balfour Beatty Vinci joint venture has been awarded a contract by Highways England to deliver a smart motorway package worth up to US$792 million, the largest of Highways England’s three packages within its US$2.3 billion Smart Motorway Programme. The joint venture will deliver smart motorway upgrades to a ten mile stretch of the M5 Junctions 4a to 6 in Worcestershire; a 12 mile section of the M6 Junctions 2 to 4 in the Midlands and a 32 mile stretch of the M4 Junctions 3 to 12 in London and Berkshir