Skip to main content

Calls for smart motorway halt grow louder

UK transport select committee says hard shoulder motorways “apparently confuse” drivers
By Ben Spencer November 5, 2021 Read time: 3 mins
Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data are available (© Gorgios | Dreamstime.com)

The UK's Transport Select Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data is available. 

Earlier this year, following several deaths, a UK coroner called for a review of the safety of such highways, which typically feature no hard shoulder.

In a new report, the committee is calling on the Department of Transport (DfT) and National Highways to halt these deployments until data over this period of time is available for the remaining 112 miles of all-lane running motorway introduced before 2020. 

The committee says the UK Government's decision in March 2020 that all new smart motorways will be all-lane running motorways was premature. 

Rollout and safety of smart motorways says the DfT and National Highways should retrofit emergency refuge areas to existing all-lane running motorways to make them a maximum of 1 mile apart, decreasing to every 0.75 miles where physically possible.

It is also urging both parties to insert the emergency corridor manoeuvre into the Highway Code to help emergency services and traffic patrol officers to access incidents when traffic is congested.

The committee also wants them to commission the Office of Rail and Road to conduct an independent evaluation of the effectiveness and operation of stopped vehicle technology.

According to the committee, the office should also evaluate how successful the Government's action plan has been in reducing incidences of live lane breakdowns on all-lane running motorways and reducing the time for which people who breakdown or stop in live lane are at risk. 

The document points out that dynamic hard shoulder motorways “apparently confuse” drivers because it is used unpredictably to tackle congestion. 

A more consistent approach, where the hard shoulder is used at known times, could clarify the situation for drivers without physically removing it.

The report advises the DfT and National Highways to pause plans to convert dynamic hard shoulder motorways until the next Road Investment Strategy. It also suggests they use the intervening period to trial alternative ways in which to operate the hard shoulder to make the rules less confusing.

The committee claims that controlled motors, which retain the hard shoulder and have the technology to regulate traffic, have the lowest casualty rates of all the types of motorway on the strategic road network. 

Therefore, it urges the DfT to carefully consider how the business case for them compares with that for all-lane running motorways.

The group concludes by saying that it is not convinced that reinstating the hard shoulder on all all-lane running motorways will improve safety as the evidence suggests that doing so could put more drivers and passengers at risk of death and serious injury. 

 

For more information on companies in this article

Related Content

  • European progress on road deaths 'disappointing', says ETSC
    June 18, 2020
    Safety body suggests that the EU will miss its target of halving fatalities by 2020
  • T-Charge introduced to older vehicles in London to tackle toxic air pollution
    October 23, 2017
    To combat thousands of premature deaths caused by air pollution in London, up to 34, 000 polluting vehicles travelling into Central London every month may have to pay the T-Charge £10.00 ($13.00) which will operate on top of the Congestion Charge £11.50 ($15.00). Launched by the Mayor of London Sadiq Khan, the T -Charge applies to drivers of pre-Euro 4 vehicles that do not meet the PM and NOx emissions and has come into effect from 7.00am on 23 October 2017.
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • Manchester orbital route to become ‘smart motorway’
    June 19, 2014
    Four companies, Balfour Beatty, together with Costain, Carillion and a BAM Nuttall Morgan Sindall joint venture, have been awarded the contract to upgrade a 17 mile stretch of the M60 and M62 to a ‘smart motorway’. The US$313 million upgrade, for the UK Highways Agency, aims to increase capacity, reduce congestion and shorten journey times for motorists. The M60 between junctions 8 and 12 will be upgraded to a controlled motorway with traffic flows managed by technology interventions responsive to the