Skip to main content

Calls for smart motorway halt grow louder

UK transport select committee says hard shoulder motorways “apparently confuse” drivers
By Ben Spencer November 5, 2021 Read time: 3 mins
Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data are available (© Gorgios | Dreamstime.com)

The UK's Transport Select Committee wants a pause on the roll-out of all-lane running motorways until five years of safety data is available. 

Earlier this year, following several deaths, a UK coroner called for a review of the safety of such highways, which typically feature no hard shoulder.

In a new report, the committee is calling on the Department of Transport (DfT) and National Highways to halt these deployments until data over this period of time is available for the remaining 112 miles of all-lane running motorway introduced before 2020. 

The committee says the UK Government's decision in March 2020 that all new smart motorways will be all-lane running motorways was premature. 

Rollout and safety of smart motorways says the DfT and National Highways should retrofit emergency refuge areas to existing all-lane running motorways to make them a maximum of 1 mile apart, decreasing to every 0.75 miles where physically possible.

It is also urging both parties to insert the emergency corridor manoeuvre into the Highway Code to help emergency services and traffic patrol officers to access incidents when traffic is congested.

The committee also wants them to commission the Office of Rail and Road to conduct an independent evaluation of the effectiveness and operation of stopped vehicle technology.

According to the committee, the office should also evaluate how successful the Government's action plan has been in reducing incidences of live lane breakdowns on all-lane running motorways and reducing the time for which people who breakdown or stop in live lane are at risk. 

The document points out that dynamic hard shoulder motorways “apparently confuse” drivers because it is used unpredictably to tackle congestion. 

A more consistent approach, where the hard shoulder is used at known times, could clarify the situation for drivers without physically removing it.

The report advises the DfT and National Highways to pause plans to convert dynamic hard shoulder motorways until the next Road Investment Strategy. It also suggests they use the intervening period to trial alternative ways in which to operate the hard shoulder to make the rules less confusing.

The committee claims that controlled motors, which retain the hard shoulder and have the technology to regulate traffic, have the lowest casualty rates of all the types of motorway on the strategic road network. 

Therefore, it urges the DfT to carefully consider how the business case for them compares with that for all-lane running motorways.

The group concludes by saying that it is not convinced that reinstating the hard shoulder on all all-lane running motorways will improve safety as the evidence suggests that doing so could put more drivers and passengers at risk of death and serious injury. 

 

For more information on companies in this article

Related Content

  • Get most dangerous drivers off Europe’s roads, say police chiefs
    October 5, 2015
    As part of its support for the European target of halving road deaths by 2020, Tispol will use its annual Conference in Manchester on 6 and 7 October to call for better protection of vulnerable road users, with greater efforts to rid Europe’s roads of the most dangerous drivers. Senior police officers, academics, policy makers and other road safety professionals will consider a range of specific issues during the two-day conference, including: Safer driving in later life; Fatigue in emergency service dr
  • Over US$2.3 billion of investment awarded to upgrade motorways in England
    July 23, 2015
    Highways England has appointed six joint-venture companies to design and build ten smart motorways across England as part of a US$2.3 billion investment. Three of these projects will start in autumn this year: two in the Midlands on the M1 J19 to J16 in Northamptonshire and the M5 J4a to J6 in Worcestershire, and one in the north-west on the M6 J16 to J19 near Stoke-on-Trent. The smart motorway schemes, part of the US$23 billion government investment Highways England is delivering between now and 2021
  • Design improvements for better truck safety delayed till 2022
    March 11, 2015
    On 10 March, the European Parliament approved amendments to the directive on the maximum authorised dimensions and weights for trucks and buses. The final agreement allows for much needed design adaptations to make cabs safer, but only following a revision by the European Commission of the cab type-approval. This means that manufacturers will not be required to implement these changes until 2022. It further retains each Member State’s right to decide whether or not they want to allow the use of mega trucks
  • Kapsch New York AET system opens
    November 24, 2020
    Cash not now accepted anywhere on 570-mile New York State Thruway Authority network