Skip to main content

Kapsch wooden gantry installed on Austrian highway

Renewable timber construction means Asfinag installation 'saves 15 tonnes of CO2'
By Adam Hill July 18, 2024 Read time: 2 mins
The Green Gantry is made from spruce and larch (© Kapsch TrafficCom)

Austrian roadway operator Asfinag has installed a Kapsch TrafficCom Green Gantry.

The largely prefabricated toll gantry is made from renewable timber rather than steel or aluminium, "which are associated with significant emissions due to their manufacturing and recycling processes", Kapsch says.

The company suggests that the Green Gantry on a highway in Carinthia, Austria, saves 15 tonnes of CO2, while comparable steel gantries create up to 30 tonnes of CO2 during production.

“Our Green Gantry not only has a positive CO2 balance, it has the same load-bearing capacity and an even better environmental impact as a traditional gantry," says Michael Weber, head of sales EMENA at Kapsch TrafficCom.

"In addition, it meets all relevant European norms and standards for gantries, so it is equally safe to deploy and to maintain, and after its lifetime of at least 20 years, it can be dismantled and re-used without causing additional pollution.”

"For us, sustainable construction is not just an empty slogan; we want to set new standards in this area," say Asfinag board members Hartwig Hufnagl and Herbert Kasser in a statement. "Innovations are the driving force behind this. Wood as a building material can also play an important role on the motorway in the future."

The gantry's load-bearing core is made of glued and laminated spruce timber, with weather-resistant larch wood used for the outer layer.

Installation of the gantry took "only about one day" and was managed by Asfinag and traffic technology specialist Forster.

Electricity for operating the gantry equipment comes from its own photovoltaic system, with battery storage also installed to ensure it works at night and in bad weather.

For more information on companies in this article

Related Content

  • Kistler bridges health data gap
    May 14, 2025
    Cloud-based software platform completes structural health monitoring package
  • Future traffic management needs new thinking, new technology
    January 23, 2012
    One of the biggest problems facing US ITS professionals, says Georgia DOT's Hugh Colton, is the constrained thinking which is sometimes forced upon those making procurement decisions. It is time, he says, to look again at how we do things. In the November/December 2010 edition of this journal, Pete Goldin interviewed Joseph Sussman, chairman of the US's ITS Program Advisory Committee. Amongst other observations that Sussman made was that, technologically, ITS in the US is 10 years behind that in the world-l
  • Bangladesh greenlights first ITS project
    April 11, 2022
    $18m contract, involving WiM systems and traffic management, due to complete end 2023
  • EU support for development of an intermodal road-rail terminal in Tarragona
    March 27, 2015
    The EU's TEN-T Programme is to provide over US$1 million to support an engineering study on an open terminal allowing the shift between rail and road cargo transport in Tarragona, Spain. The study will prepare grounds for the construction of the terminal after the permits are issued. The new terminal will help reduce both freight transport costs and CO2 emissions, as well as improve overall safety. It will have 115,000 loading units capacity per year, equivalent to eight trains per day and 2.3 million m