Skip to main content

Yutraffic Varia chosen for Sydney's new harbour crossing

Western Harbour Tunnel is being built to take pressure off existing routes in Australian city
By Adam Hill January 3, 2024 Read time: 2 mins
Sydney's population is projected to grow from five million to eight million over the next 40 years (© Tuayai | Dreamstime.com)

Yunex Traffic is to deliver the traffic control software solution for a major infrastructure project in Sydney, Australia.

The twin, 6.5km Western Harbour Tunnel, currently under construction, will run beneath the city's harbour with three lanes in each direction, creating a western bypass for the central business district and taking pressure off existing routes such as the Sydney Harbour Bridge.

Yunex Traffic will work with Transport for New South Wales and Acciona to deploy its motorway control system, Yutraffic Varia. 

The company says the platform integrates all important tunnel systems and sub-systems - relating to ventilation, lighting, traffic flow and so on - which means operators "will be able to monitor and manage all processes in a single application, simplifying control and increasing safety".

Automatic response plans and strategies enable an immediate reaction to unpredictable traffic situations and incidents, such as a blocked lane, a stationary vehicle or even a fire in a tunnel, it adds.

Transport for NSW says the new tunnel will provide "improved transport connections with faster access to public transport interchanges and future opportunities for new direct bus services".

The key reason for the expansion is because Sydney's population is projected to grow from five million to eight million over the next 40 years, with the city's economy expected to double by 2031.

“Sydney is an example of what we see around the world: while a growing urban population promises economic growth, the existing transportation infrastructure demands innovation that meets people's needs," says Fred Kalt, MD of Yunex Traffic Asia Pacific.

"Intelligent solutions are needed to help reduce congestion, increase travel speed and safety – and ultimately lead to more livable cities with cleaner air to breathe."

The Western Harbour Tunnel is being delivered in two stages, with Acciona delivering the second. This includes the excavation and construction of an underground motorway from Cove Street Rozelle to North Sydney, with direct connections to and from the Warringah Freeway, an off-ramp to Falcon Street and an on-ramp from Berry Street at North Sydney. 

The contract also includes ventilation outlets, motorway facilities, and the mechanical and electrical fit-out of the entire tunnel.

For more information on companies in this article

Related Content

  • Counting the environmental costs of ITS deployment
    October 29, 2015
    David Crawford looks at the latest thinking about calculating the benefits associated with the environmental side of ITS schemes. The penny is dropping that some environmental costs “are being shifted outside the traditional bounds of evaluation methods” for ITS-based road transport projects, according to researchers at the UK University of Leeds’ Institute for Transport Studies.
  • ITS helps shorten trips in Colombia
    April 29, 2022
    Kapsch TrafficCom provides Dynac incident management and ATMS software for Vias del Nus
  • Control room tech ends data overload
    July 22, 2021
    There have never been so many data sources available to traffic control centre operators – but too much data can be as bad as too little when making decisions. Adam Hill asks how control room technology companies can help operators screen out the white noise
  • $130m infrastructure spend in Vancouver
    August 18, 2022
    TransLink invests in cycling paths, walkways, multi-use paths, intersections and roads