Skip to main content

WJ Group marks out new territory

Company gears up to demarcate pop-up cycle and walking routes in England
By David Arminas May 27, 2020 Read time: 2 mins
WJ puts finishing touches on temporary markings outside London’s Nightingale Hospital

As a “key worker” company under the UK’s Covid pandemic designation, WJ Group is working on markings for temporary, or pop-up, bike and walking lanes.

With the coronavirus crisis likely to continue for some months at least, the concern is that people will shy away from public transport and revert to using their own cars, according to the company.

Consequently there is an urgent need to make the alternatives of cycling and walking safer and more attractive.

Lack of traffic has made safe road space available to cyclists and pedestrians of all generations and the government is keen to continue this beyond lockdown and into the so-called 'new normal' period.

The government has backed up this change with the recent launch by Grant Shapps, the UK’s transport secretary, of £2 billion (US$2.5 billion) funding initiative to boost healthier, greener, active transport as the country emerges from lockdown.

With the first stage of this funding, totalling £250 million, being made available within weeks, markings specialist WJ has already started to work with authorities to install markings for more cycle lanes and social distancing footway demarcation in line with measures identified by the Department for Transport.

WJ is using a range of high performance thermoplastics, paints and preformed markings for permanent solutions. But the company said that it is also advising on temporary markings with tape, self-adhesive studs and their innovative Applied Media floor signage to create more flexibility.
 
For some time, the Applied Media floor graphic system has been approved for use by Transport for London on the London Underground, used for London Pride rainbow crossings and very recently used for NHS Nightingale Hospital bus shuttle and social distancing measures on the Dockland Light Railway.

WJ has extensive experience particularly in temporary markings, most notably providing all the markings for the London 2012 Olympic Route Network, explained Martin Webb, operational director for WJ Group.

The company is also the lead provider of markings for Highways England across England’s Strategic Road Network.

For more information on companies in this article

Related Content

  • Bristol’s buses trial CycleEye detection system
    July 7, 2017
    Fusion Processing’s Jim Hutchinson looks at a two-year trial of the company’s cyclist detection system. Is cycling in a city dangerous? Well, that depends where you are and how you view statistics. Malmö is far more bike-friendly than Mumbai and the risk can either be perceived as small - one death per 29 million miles cycled in the UK in 2013 - or large - that equated to 109 deaths in the same year. Whatever your personal take on the data, the effect of these accidents can be felt indirectly too. News of c
  • Remove 80 per cent of traffic lights to boost economy and road safety, says IEA report
    January 26, 2016
    In a new report, authors Martin Cassini and Richard Wellings of the UK Institute of Economic Affairs demonstrate what they say are the negative social and economic effects of the government’s traffic management strategy, and argue for policies that harness voluntary cooperation among road-users. Using case-studies from around Britain, in conjunction with evidence from successful schemes in both Holland and Germany, they estimate that approximately 80 per cent of traffic lights could be ripped out in the UK.
  • Parsons: three things ITS professionals can do about Covid-19
    May 28, 2020
    There is a way out of this: it is possible to address the impacts of coronavirus on our transportation networks, suggest Andrew Liu and Daniel Lukasik of Parsons
  • Olympic challenges in Sochi
    May 27, 2014
    Sporting events always create problems for traffic planners and none more so than the Winter Olympics. It is difficult to think of more diametrically opposite challenges for transport planners than the 2012 Olympics in London and this year’s Winter Olympics in Sochi: from a summer event in the heart of a megacity with well established transport infrastructure to winter games with unpredictable weather and events in remote and mountainous locations. The Winter Games are always a challenge and Sochi was no di