Skip to main content

WJ Group marks out new territory

Company gears up to demarcate pop-up cycle and walking routes in England
By David Arminas May 27, 2020 Read time: 2 mins
WJ puts finishing touches on temporary markings outside London’s Nightingale Hospital

As a “key worker” company under the UK’s Covid pandemic designation, WJ Group is working on markings for temporary, or pop-up, bike and walking lanes.

With the coronavirus crisis likely to continue for some months at least, the concern is that people will shy away from public transport and revert to using their own cars, according to the company.

Consequently there is an urgent need to make the alternatives of cycling and walking safer and more attractive.

Lack of traffic has made safe road space available to cyclists and pedestrians of all generations and the government is keen to continue this beyond lockdown and into the so-called 'new normal' period.

The government has backed up this change with the recent launch by Grant Shapps, the UK’s transport secretary, of £2 billion (US$2.5 billion) funding initiative to boost healthier, greener, active transport as the country emerges from lockdown.

With the first stage of this funding, totalling £250 million, being made available within weeks, markings specialist WJ has already started to work with authorities to install markings for more cycle lanes and social distancing footway demarcation in line with measures identified by the Department for Transport.

WJ is using a range of high performance thermoplastics, paints and preformed markings for permanent solutions. But the company said that it is also advising on temporary markings with tape, self-adhesive studs and their innovative Applied Media floor signage to create more flexibility.
 
For some time, the Applied Media floor graphic system has been approved for use by Transport for London on the London Underground, used for London Pride rainbow crossings and very recently used for NHS Nightingale Hospital bus shuttle and social distancing measures on the Dockland Light Railway.

WJ has extensive experience particularly in temporary markings, most notably providing all the markings for the London 2012 Olympic Route Network, explained Martin Webb, operational director for WJ Group.

The company is also the lead provider of markings for Highways England across England’s Strategic Road Network.

For more information on companies in this article

Related Content

  • Silk Metal sound barrier for London
    December 7, 2020
    Beep Studio says the project combines public art and acoustic barrier in one structure
  • Geveko Markings shows ViaTherm Viking material
    March 19, 2018
    Geveko Markings is showing how it has addressed the situation in which road marking is not possible because surfaces are too moist or wet. With the company’s ViaTherm Viking, the application window for bulk thermoplastic is increased and the application season is prolonged. ViaTherm Viking is a thermoplastic road marking material specially developed for application during early spring and late autumn when there tends to be moisture on the roads. It has special adhesion properties, high functional
  • Why integrated traffic management needs a cohesive approach
    April 10, 2012
    Traffic control is increasingly being viewed as one essential element of a wider ‘system of systems’ – the smart city. Jason Barnes, Jon Masters and David Crawford report on latest ideas and efforts for making cities ‘smarter’ Virtually every element of the fabric and utilitarian operations that make urban areas tick can now be found somewhere in the mix that is the ‘smart city’ agenda. Ideas have expanded and projects pursued in different directions as the rhetoric on making cities ‘smarter’ has grown. App
  • Reauthorization 2012: the facts laid bare
    September 12, 2012
    A reauthorization bill for transportation came into law in July 2012, rubber stamping federal funding increases through the 2014 financial year, among other things. The new bill presents the good, the bad and the ugly of transportation infrastructure in the US, writes Pat Jones On June 29 this year, the US House of Representatives and Senate both approved the conference report on the ‘Moving Ahead for Progress in the 21st Century Act’ or MAP-21. President Obama signed this legislation into law on July 6.