Skip to main content

WJ Group marks out new territory

Company gears up to demarcate pop-up cycle and walking routes in England
By David Arminas May 27, 2020 Read time: 2 mins
WJ puts finishing touches on temporary markings outside London’s Nightingale Hospital

As a “key worker” company under the UK’s Covid pandemic designation, WJ Group is working on markings for temporary, or pop-up, bike and walking lanes.

With the coronavirus crisis likely to continue for some months at least, the concern is that people will shy away from public transport and revert to using their own cars, according to the company.

Consequently there is an urgent need to make the alternatives of cycling and walking safer and more attractive.

Lack of traffic has made safe road space available to cyclists and pedestrians of all generations and the government is keen to continue this beyond lockdown and into the so-called 'new normal' period.

The government has backed up this change with the recent launch by Grant Shapps, the UK’s transport secretary, of £2 billion (US$2.5 billion) funding initiative to boost healthier, greener, active transport as the country emerges from lockdown.

With the first stage of this funding, totalling £250 million, being made available within weeks, markings specialist WJ has already started to work with authorities to install markings for more cycle lanes and social distancing footway demarcation in line with measures identified by the Department for Transport.

WJ is using a range of high performance thermoplastics, paints and preformed markings for permanent solutions. But the company said that it is also advising on temporary markings with tape, self-adhesive studs and their innovative Applied Media floor signage to create more flexibility.
 
For some time, the Applied Media floor graphic system has been approved for use by Transport for London on the London Underground, used for London Pride rainbow crossings and very recently used for NHS Nightingale Hospital bus shuttle and social distancing measures on the Dockland Light Railway.

WJ has extensive experience particularly in temporary markings, most notably providing all the markings for the London 2012 Olympic Route Network, explained Martin Webb, operational director for WJ Group.

The company is also the lead provider of markings for Highways England across England’s Strategic Road Network.

For more information on companies in this article

Related Content

  • UK govt seeks cycle safety evidence as report calls for new laws
    March 13, 2018
    A report from legal expert Laura Thomas has claimed that there is a strong case for changing the law to combat dangerous cycling, which if implemented, would bring offences in line with dangerous driving. It ties in with the Department for Transport's Call for Evidence, which is seeking to address issues that cyclists and pedestrians face, or perceive when using the road infrastructure. Thomas said: “Overall, in my opinion, the present law on cycling is not sufficient. I suggest that an offence comprising
  • CBI calls for new approach to road funding
    October 11, 2012
    The Confederation of British Industry (CBI) calls for road charging should be introduced on the strategic road network in England. Proposals in the report, Bold Thinking: A model to fund our future roads also suggest that responsibility for the network’s budget should be taken away from the Department for Transport (DfT) and given to an independent regulator. Launching the report, CBI director-general John Cridland said a regulatory asset base (RAB) model was required to address the problem of long-term fu
  • Informal transport moves emerging megacities
    August 11, 2020
    If you want to get to work in emerging markets, the chances are you may not be using traditional public transit lines. Devin de Vries of WhereIsMyTransport makes the case for informal networks
  • England prescribes bikes on NHS
    July 28, 2020
    Cycling seen as a way of encouraging healthier lifestyles amid obesity crisis