Skip to main content

PlasticRoad speeds up recycled cycle path

The maker of a prefab bike path of recycled plastic said pilot projects have been a success
By David Arminas July 27, 2020 Read time: 2 mins
A million bicycle passes later, PlasticRoad is the real thing

The world’s first plastic surfaced bike path, laid in the Netherlands, has recorded its millionth crossing, according to PlasticRoad, the company that makes the surface.

PlasticRoad – also the name of the product – is made from recycled plastic waste.

The company of the same name is an initiative of KWS - a VolkerWessels company – as well as Wavin and Total. It said that after one and a half years of testing and development into a design suited for industrial production, the technology is ready to be launched on the market.

The results of the two 30m bike path pilot projects in the Netherlands show that it is possible to construct prefabricated roads consisting of recycled plastic waste.

Each pilot contains about 1,000kg of recycled plastics, the equivalent of 218,000 plastic cups. The pilot version of the PlasticRoad has cut CO₂ emissions by between 50% and 70% compared to conventional bike paths made from asphalt or concrete slabs, claims the company.

The definite version of PlasticRoad will be more rugged and 2.5 times stronger than the test sections laid in Zwolle and Giethoorn.

This makes the PlasticRoad suited for applications like parking lots and the company said it is preparing the first pilot project for this particular application. The company also said that is a step closer to realising the use of PlasticRoad for cars and other road traffic.

The hollow sections under the PlasticRoad’s surface are intended to quickly store sudden precipitation runoff and gradually allow it to infiltrate the subsoil.

This climate-adaptive solution turns out to work very well in practice. The highest water level measured within the PlasticRoad was only 48% of the available storage capacity at the Zwolle test site. The water subsequently infiltrates the subsoil within the next two days – as predicted.

The company said it will look at clients in the Netherlands and neighbouring countries, after which they expect to scale up to markets in other parts of the world.

For more information on companies in this article

Related Content

  • Data holds the key to combating VRU casualties
    May 8, 2015
    Accident analysis software can help authorities identify common causes and make best use of their budgets, as Will Baron explains. More than 1.2 million people die on the world’s roads each year and according to the World Health Organisation, half of these are pedestrians and vulnerable road users (those whose vehicle does not have a protective shell, such as motorcyclists and cyclists). While much has been done to improve road safety and cut the number of deaths and serious injuries on our roads, a great d
  • Chicago launches urban sensing project
    September 1, 2016
    The first phase of an urban sensing Array of Things project has begun in Chicago with the installation of the first of an eventual 500 nodes on city streets. The sensors will collect data on air quality, climate, traffic and other urban features, kicking off a partnership between the University of Chicago, Argonne National Laboratory and the City of Chicago to better understand, serve and improve cities.
  • Funding for cycling infrastructure in Galway
    February 19, 2015
    Galway in Ireland is set to receive part of a US$2.5 million government transport improvement grant to develop cycle paths and other cycling infrastructure in the city and the surrounding area. The grant will be distributed between 14 projects and, as well as money for cycling projects, other transport initiatives will receive funding. The cycling improvements will consist of new cycle paths and on-road cycle lanes, shared cycle-pedestrian facilities, crossing upgrades, increased bike parking facilities, im
  • AV ride-pooling in Hamburg by 2025
    September 17, 2021
    VW, Moia and Argo AI's plan is important piece of future mobility 'puzzle', says German city