Skip to main content

Melbourne fast-tracks 40km of new bike lanes

Australian city binned its bike-share scheme but is now making more space for two wheels
By Adam Hill June 17, 2020 Read time: 2 mins
The Melbourne bike-share scheme was scrapped last year, but the city is still keen on bikes (© Rafael Ben Ari | Dreamstime.com)

The City of Melbourne is making more space on its roads for bicycles, adding 40km of dedicated bike lanes to its road network. 

Lord Mayor Sally Capp said they would be 'adaptable', which means they "can be constructed and installed more quickly".

The city, which scrapped its own bike-share scheme last year, said lanes will be built in two stages, with the first 20km in 2020-21 via a $16 million investment.

The new routes are part of the Australian city's Transport Strategy 2030, which sets out a 10-year plan to become a "premier cycling city with a network of protected cycling lanes and intersections, lots of bike parking and facilities for cyclists".

"We've seen other leading cities around the world such as Paris, London and Milan successfully integrate cycling as a key mode of transport to reduce congestion and accommodate growth," said councillor Nicolas Frances Gilley, transport portfolio chair.

"We will use plastics, rubber and recycled materials than can be installed quickly so we can accelerate bike lane delivery. The infrastructure we install will be functional for years to come and can be progressively replaced with fixed lanes over time as required."

The authorities have carried out research which suggests that it is essential to create physical protection from motor vehicles if people are to have the confidence to ride in the city centre.

The first priority routes include:

Exhibition Street stage one (Flinders Street to Bourke Street)
Rathdowne Street (Victoria Street to Faraday Street)
William Street (Dudley Street to Flinders Street)
Abbotsford Street (Flemington Road to Queensberry Street)
Swanston Street (around the University of Melbourne from Grattan Street to Cemetery Road).

For more information on companies in this article

Related Content

  • Cubic names new general manager of Melbourne transport operations
    September 25, 2015
    Following its recent short-listing in the request for tender stage of the tender process to run the myki system in Melbourne, Australia, when the current contract expires in 2016, Cubic Transportation Systems has appointed Bruce Were as general manager of the company’s operations in Victoria. Were will have responsibility for handling the myki smart card ticketing project and will lead a Cubic team in Melbourne that is dedicated to working on the tender process, which is expected to be completed in mid-2
  • Diversity dominates ITS recruitment workshop
    October 27, 2016
    ITS offers more interesting and engaging careers than other engineering disciplines because it is less component-based and gives more importance to human factors and the integration of other domains. So says the report from a multinational recruitment stakeholder workshop staged by ITS(UK) at the 2016 ITS in Europe Congress.
  • Knowing when to slow down
    August 8, 2018
    Level 2 driver assistance vehicles have little problem reading fixed metal signs at the roadside - but it’s a different story with VMS in tunnels, finds Alan Dron. Following a series of hands-free driving tests in tunnels, an Australian road authority believes that car manufacturers have to up their game before vehicles have the required levels of competence to consistently perform ‘assisted driving’ tasks. The trials, in the state of Victoria late last year, tested the ability of several vehicles to stay
  • Here: AI has place in ‘privacy by design’
    June 23, 2020
    Artificial intelligence may improve traffic in cities and keep location data private, but Here Technologies shows that it only takes four points of anonymous data to predict your identity.