Skip to main content

London's new £19bn transit line opens

Elizabeth Line speeds up east-west travel in the UK capital and its surrounding areas
By Adam Hill May 24, 2022 Read time: 2 mins
Construction of the £19bn project began in 2009 (© ITS International)

London's newest public transportation line opened today.

Construction of the £19bn Elizabeth Line, named after the UK's 96-year-old monarch Queen Elizabeth II, began in 2009.

Designed to speed up travel between the east and west of the UK capital and its surrounds, it was due to open in 2018 but was delayed by engineering difficulties.

The new route is 62 miles (100km), including 25.5 miles (41km) under London and 36.5 miles (59km) above ground.

It halves journey times from Abbey Wood, south-east of London, to Paddington in the centre, to 29 minutes.

While there has been criticism of the 'Crossrail' infrastructure project's $4bn overspend and late opening, much has been made of the economic advantages of having trains running every five minutes via the commercial areas of Canary Wharf and the City of London, as well as into the retail and entertainment areas of the capital's West End.

Mohamed Mezghani, secretary-general of the International Association of Public Transport (UITP), tweeted: "£19bn investment for £42bn positive impact on the economy of London: public transport is good for the economy."

Until autumn 2022, the Elizabeth Line will run as three separate railways, but it is expected to be fully linked after that, connecting to the city of Reading, west of London, and Heathrow Airport, through to the county of Essex to the north-east of London.

For more information on companies in this article

Related Content

  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • Brazilian PPP metro contract signed
    October 22, 2013
    Brazilian highway and metro concessionaire CCR has signed a US$1.85 billion contract for a public-private partnership (PPP) to carry out phase II work on Bahia state capital Salvador's metro system in northeast Brazil. The PPP involves building a total of 33.4 kilometres of metro lines and 19 stations and includes building an extension to the metro's existing 6.6 kilometre line 1 and preparing a project to extend the line some a further 3.6 kilometres.
  • Prospects for intercity transport technology
    February 1, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • Prospects for intercity transport technology
    February 6, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it