Skip to main content

London's new £19bn transit line opens

Elizabeth Line speeds up east-west travel in the UK capital and its surrounding areas
By Adam Hill May 24, 2022 Read time: 2 mins
Construction of the £19bn project began in 2009 (© ITS International)

London's newest public transportation line opened today.

Construction of the £19bn Elizabeth Line, named after the UK's 96-year-old monarch Queen Elizabeth II, began in 2009.

Designed to speed up travel between the east and west of the UK capital and its surrounds, it was due to open in 2018 but was delayed by engineering difficulties.

The new route is 62 miles (100km), including 25.5 miles (41km) under London and 36.5 miles (59km) above ground.

It halves journey times from Abbey Wood, south-east of London, to Paddington in the centre, to 29 minutes.

While there has been criticism of the 'Crossrail' infrastructure project's $4bn overspend and late opening, much has been made of the economic advantages of having trains running every five minutes via the commercial areas of Canary Wharf and the City of London, as well as into the retail and entertainment areas of the capital's West End.

Mohamed Mezghani, secretary-general of the International Association of Public Transport (UITP), tweeted: "£19bn investment for £42bn positive impact on the economy of London: public transport is good for the economy."

Until autumn 2022, the Elizabeth Line will run as three separate railways, but it is expected to be fully linked after that, connecting to the city of Reading, west of London, and Heathrow Airport, through to the county of Essex to the north-east of London.

For more information on companies in this article

Related Content

  • A new tube for London
    August 13, 2013
    London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
  • A new tube for London
    August 13, 2013
    London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in
  • APTA calls for $23.8bn from Congress
    May 20, 2020
    Money is needed for public transit – on top of $25bn 'lifesaver' already pledged