Skip to main content

London's new £19bn transit line opens

Elizabeth Line speeds up east-west travel in the UK capital and its surrounding areas
By Adam Hill May 24, 2022 Read time: 2 mins
Construction of the £19bn project began in 2009 (© ITS International)

London's newest public transportation line opened today.

Construction of the £19bn Elizabeth Line, named after the UK's 96-year-old monarch Queen Elizabeth II, began in 2009.

Designed to speed up travel between the east and west of the UK capital and its surrounds, it was due to open in 2018 but was delayed by engineering difficulties.

The new route is 62 miles (100km), including 25.5 miles (41km) under London and 36.5 miles (59km) above ground.

It halves journey times from Abbey Wood, south-east of London, to Paddington in the centre, to 29 minutes.

While there has been criticism of the 'Crossrail' infrastructure project's $4bn overspend and late opening, much has been made of the economic advantages of having trains running every five minutes via the commercial areas of Canary Wharf and the City of London, as well as into the retail and entertainment areas of the capital's West End.

Mohamed Mezghani, secretary-general of the International Association of Public Transport (UITP), tweeted: "£19bn investment for £42bn positive impact on the economy of London: public transport is good for the economy."

Until autumn 2022, the Elizabeth Line will run as three separate railways, but it is expected to be fully linked after that, connecting to the city of Reading, west of London, and Heathrow Airport, through to the county of Essex to the north-east of London.

For more information on companies in this article

Related Content

  • UK Government announces funding for Smart Mobility Lab in London
    October 23, 2017
    A consortium led by TRL has been awarded £13.4 million ($10.1 million) of the UK government's £51 million ($38 million) Connected and Autonomous Vehicle (CAV) testbed funding to create a Smart Mobility Living Lab (SMLL) in Greenwich and nearby Queen Elizabeth Olympic Park, Stratford, London. The funding is part of the £100 million ($75 million) UK CAV test bed competitive fund and is the first investment by government and industry through Meridian to develop a national CAV testing infrastructure.
  • HumanForest brings e-mopeds to London 
    December 28, 2021
    Vehicles can travel up to 28mph and join fleet of e-bikes already in UK capital
  • Saudi prepares for city without cars
    January 15, 2021
    The Line is 170km-long development planned to feature high-speed transit and AVs
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency