Skip to main content

Ford unveils Detroit 'walkable mobility' district

Corktown neighbourhood plan is part of wider regeneration including C/AV corridor 
By Ben Spencer November 26, 2020 Read time: 2 mins
Ford is to develop a mobility platform on elevated train tracks behind the station (© Ford)

Ford Motor Company has revealed the site plan for Michigan Central, a walkable mobility district in the Corktown neighbourhood of Detroit.

According to Ford, the site plan meets Detroit's goal to develop areas full of open space and multimodal transit options within 20 minutes.

The automaker confirmed it is on track to restore the city's Michigan Central Station by the end of 2022.

In 2018, executive chairman Bill Ford announced plans to restore the train station, abandoned in 1988, as the centrepiece of an innovation hub to help define the way people move around.

Ford is to develop a mobility platform on elevated train tracks behind the station with new open spaces that connect site buildings.

It will allow Ford and its partners to test emerging technology such as autonomous vehicle and micromobility initiatives. 

As part of the project, the district will serve as part of Michigan’s proposed connected and autonomous vehicle (C/AV) corridor running from Detroit to Dearborn to Ann Arbor, linking the district to a broader regional network of testing and research.

Boston landscape architect Mikyoung Kim Design and Detroit-based LivingLab will design the mobility platform and other open spaces around Michigan Central. 

Mary Culler, Ford’s Detroit development director, says: “At Michigan Central, we are taking a collaborative approach to innovation, including providing flexible work spaces that attract and engage the best minds to solve complex transportation and related challenges as we shape the future of mobility together.”

The 30-acre site plan – developed by Practice for Architecture and Urbanism – is expected to prioritise the needs of residents and 5,000 employees in the area.

Adjacent to the station, the Book Depository is being revitalised to offer co-working areas and hands-on laboratories by architecture firm Gensler. 

East of the station, Ford is to build a parking garage and mobility hub at 14th and Bagley that provides 1,250 parking spaces for Michigan Central workers.

Work on the Book Depository and the Bagley Parking Hub will begin in the first quarter of 2021 and are expected to open in early 2022.

For more information on companies in this article

Related Content

  • Phoenix rises to the Smart City challenge
    December 10, 2015
    Andrew Bardin Williams looks at the City of Phoenix where voters backed a $30bn plan to revamp its transportation network to cultivate a more connected community. According to a Land Use Institute study, half of all Americans and even more millennials (63%) would like to live in a place where they do not need to use a car very often. The City of Phoenix is putting in place plans to revamp its urban development and transportation policies to meet these changing quality of life perceptions.
  • Ford Mobility: analytics aids transport proactivity
    April 2, 2020
    Ford Mobility has demonstrated how data analytics can help implement London's transport strategy in areas such as traffic re-timing and in eliminating all road fatalities (Vision Zero) by 2041.
  • Aimsun helps use community intelligence to improve mobility
    July 23, 2024
    A paradigm shift from traditional to data-driven community-aware transport solutions has guided development of cooperative transport management strategies in the FRONTIER research project
  • Second phase of Sungai Buloh-Kajang mass rapid transit enters operation, Malaysia
    August 25, 2017
    The second phase of the Sungai Buloh-Kajang Mass Rapid Transit line in Malaysia has entered operation. Mott MacDonald was responsible for the detailed design, modelling and construction supervision of three underground stations and four elevated stations on the line. The 51km line features 31 stations and will serve the 1.2 million residents of the Klang Valley area of Kuala Lumpur. In the capital, there are 9.5km of tunnels with seven underground stations and two portals linking the above ground track t