Skip to main content

Bombardier delivers Bangkok monorails

Manufacturer also developing APM system for Thailand's driverless mass transit system 
By Ben Spencer October 13, 2020 Read time: 1 min
The first Bombardier Innovia monorail 300 vehicles for Bangkok’s new MRT Pink and Yellow Lines were welcomed at Laem Chabang Port near Bangkok (© Bombardier)

Bombardier Transportation has delivered monorails for Bangkok's Metropolitan Rapid Transit (MRT) Pink and Yellow Lines, which will provide 64km of transportation links across Thailand's capital. 

The rail technology company says its Innovia 300 monorails will be able to run at speeds of up to 80km/h and with a maximum system capacity of more than 28,000 passengers per hour in each direction.

Bombardier’s scope on the 34.2km Pink and 30.4km Yellow Lines comprises 72 four-car Innovia monorail 300 trains, wayside systems and the automated Bombardier Cityflo 650 rail control and system integration.
 
Bombardier’s Bangkok Engineering Centre is delivering the system with vehicles manufactured by the CRRC Puzhen Bombardier Transportation Systems joint venture.

This is part of an agreement with railway rolling stock manufacturer CRRC Nanjing Puzhen which specialises in the manufacturing and selling of automated people mover (APM) and monorail vehicle and systems. 

In a separate move, Bombardier is delivering its Innovia APM 300 system for Thailand's driverless mass transit system, the Gold Line. It is also the signalling supplier for the Bangkok Skytrain and MRT Purple Line and a section of the State Railway of Thailand’s Northern Line upgrade.
 

For more information on companies in this article

Related Content

  • Greener transit via Maryland microgrid
    November 7, 2022
    Arup is involved in Montgomery County smart energy project in Maryland, US
  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • Thales to deploy ETCS Level 2 on Turkey's first high-speed rail line
    March 14, 2012
    Thales has signed a new US$26.3 million signalling contract with Turkish State Railways (TCDD) to install the ETCS Level 2 system, including automatic train protection and GSM-R communications, for the 250 km double-track Eskisehir-Sincan section of the Ankara-Istanbul high-speed line.
  • Major rail contracts for Thales
    September 18, 2012
    Thales has announced the award of two major rail system contracts in Slovenia and China. The first, a US€40 million contract with the Slovenian Transport Ministry is for the provision of a complete European Train Control System (ETCS) Level 1 on the Slovenian part of Corridor D. Due for completion in 2015, this project in partnership with GH Holding concerns the 350 km line stretching from the Hungarian border to Italy. The company says this contract represents one of the most important ETCS Level 1 infras